Roads / Tunnel / Bridge
Kier International Assistant Planner
Senior Engineer in charge of planning, logistics & construction supervision for the construction of the LNG Terminal Jetty Head
Laing O Rourke UK Planner
Tender Planner for Laing ORourke Infrastructure
Project Dynamics Limited Forensic Planner
Forensic Planning for M50 Widening in Dublin
Nakheel Civil Engineer
Project - Palm Jebel Ali Project (Man-made Island)/ Dubai Waterfront Project
Responsibilities:
-Valuation of Payment Applications Submitted by Contractors
-Preparation of Payment Certificate and ensure that all necessary documents are attached.
-Determination of the Validity, Valuation and Reconciliation of Variations and Star Rates
-Preparation of counter claims against contractors
-Remeasurement of work for evaluation of final account
-Prepares contract status report for Palm Jebel Ali and Waterfront Contracts
Construction Planning Manager, London Bridge Associates Ltd, HS2
HS2 Lot1b London Metropolitan - Construction Planning Manager
The Lead Planner role includes the management of a construction team dealing with:
· The production of Primavera P6 programmes for the London Metropolitan section.
· The production of Community Forum Area planning reports and design documents relating to constructability.
Planner, Macmahon Construction Pty. Ltd., Bulk Earthworks
I am working as a Planner since Jan-07. Worked 2 years in Qatar with piling contracting company. Currently I am working in Australia with one of the leading Construction company in estimation team as a Planner.
Assistant Project Engineer, SHJ Development Corporation, (various projects)
As Assistant Project Engineer, I have assisted in the revision/drafting of all construction plans & other details for a forty (40) hectares subdivision using AutoCAD 2000 software. I was also assigned to supervise in the construction works of some specific area of the project which includes surveying works like differential & profile leveling.
Engineering Equipment International Corp. (EEI) Assistant Planner
Prepares fabrication checklist and maintain proper quantity tracking of on going and outgoing completed items. Consolidates and translate inputs into project operational plan and schedule. Maintain an update plan and as-built schedule of assigned projects.Prepares progress accomplishment report. Originates, initiates, identifies events of delays, notification, quantification and filing of claims for extension of time of the project.
Pagination
- Previous page
- Page 174
- Next page