Roads / Tunnel / Bridge

Nakheel Civil Engineer

A
Arzie Cruz 👤 Member for 19 years 8 months

Project - Palm Jebel Ali Project (Man-made Island)/ Dubai Waterfront Project



Responsibilities:



-Valuation of Payment Applications Submitted by Contractors

-Preparation of Payment Certificate and ensure that all necessary documents are attached.

-Determination of the Validity, Valuation and Reconciliation of Variations and Star Rates

-Preparation of counter claims against contractors

-Remeasurement of work for evaluation of final account

-Prepares contract status report for Palm Jebel Ali and Waterfront Contracts

Construction Planning Manager, London Bridge Associates Ltd, HS2

START Date
END Date
Experience Hours (Planning & Scheduling)
3500
Experience Hours (Cost Management)
500

HS2 Lot1b London Metropolitan - Construction Planning Manager

The Lead Planner role includes the management of a construction team dealing with:

·  The production of Primavera P6 programmes for the London Metropolitan section.

·  The production of Community Forum Area planning reports and design documents relating to constructability.

Assistant Project Engineer, SHJ Development Corporation, (various projects)

START Date
END Date

As Assistant Project Engineer, I have assisted in the revision/drafting of all construction plans & other details for a forty (40) hectares subdivision using AutoCAD 2000 software. I was also assigned to supervise in the construction works of some specific area of the project which includes surveying works like differential & profile leveling.

Engineering Equipment International Corp. (EEI) Assistant Planner

Prepares fabrication checklist and maintain proper quantity tracking of on going and outgoing completed items. Consolidates and translate inputs into project operational plan and schedule. Maintain an update plan and as-built schedule of assigned projects.Prepares progress accomplishment report. Originates, initiates, identifies events of delays, notification, quantification and filing of claims for extension of time of the project.