Roads / Tunnel / Bridge

Principal Planning Engineer, 1) Carillion plc, Kirkintilloch Link Road

A
Alan Holt 👤 Member for 21 years 10 months
START Date
END Date

I was the site Planning Engineer for the Kirkintilloch Link Road, a 4.6Km road valued at £35M reporting directly to the Contracts manager and Commerclai Manager.  I developed a fully logic linked cost and resource loaded programme as required by the NEC Contract Conditions for the works which was used both by Carillion and our various client groups for cost and value monitoring and forecasting and has become essential for Cost Index analysis.  The programme is also used to demonstrate the effect of compensation events and project manager’s instructions.  

Planning Manager, Techno Engineering and Associates ME WLL, Dualization of Bidbid Sur Road Project

START Date
END Date
Experience Hours (Planning & Scheduling)
4800
Experience Hours (Cost Management)
1300
Experience Hours (Forensic Analysis)
2400

Over 14 years of rich, qualitative and in depth experience in Construction Planning & Management, Site Construction, Resource Planning, Contracts Management, etc. Currently working with Techno Engineering & Associates Middle East WLL, Muscat, Oman as Senior Planning Engineer. Applying project management knowledge, technical and interpersonal skills and project management tools and techniques to meet the requirements of large to medium projects.

SEDE-UAE Senior Planner

As a Chief Planning & Controlling Engineer for Sultanate of Oman Branch.

•     AL-Masarrat Main Water Supply System Project - Sultanate of Oman

(R.O 25 096 570)

Consultant: : Mott McDonald (England).





As a Chief Planning, Controlling& Technical Manager

for the following project:

•     Surface & Storm Water Drainage in Southern Sectors in Mussafah zone - Abu Dhabi

(Dhs. 39 039 000).

Consultant: Hyder ( John Tailor ) - England