Roads / Tunnel / Bridge

Asst.Manager - Project controls, PT. Wiratman & Associates, Tapin Coal Terminal Project

START Date
  • Prepare Project Master Schedule
  • Tracking Project Schedule (Daily)
  • Control Project Execution
  • Prepare Material Shipment Plan
  • Prepare Progress Report (Weekly & Monthly)
  • Analyze Problem & Prepare Corrective Action

Construction Project Manager, Mainzeal Property and Construction Ltd, Manurewa Police station

START Date
END Date

 Project Manager / Ran the project valued $4m which was the demolition and construction of a multistory police station.  No planner was allocated to the project so I did that work as well.

Worked with my siye supervsor and Quatity Survayor to complete the project on time and on budget.

Bridge and Structural Engineer, ASHGHAL - PWA QATAR, PRE AND POST CONTRACT PROFESSIONAL CONSULTANCY SERVICES FOR :

START Date

Detailed investigation and a full assessment of the conditions of a number of structures. These structures include bridges and underpasses that are located along different parts of the Qatar road network and they vary in age, type, size and condition.

Bridge and Structural Engineer, ASHGHAL - PWA QATAR, PWA/ITC/041/10-11 (PRE AND POST CONTRACT PROFESSIONAL CONSULTANCY SERVICES FOR :)

START Date
END Date

Detailed investigation and a full assessment of the conditions of a number of structures. These structures include bridges and underpasses that are located along different parts of the Qatar road network and they vary in age, type, size and condition.

vinayak naik

First Name
vinayak
Last Name
naik
Professional Since
Oldest experience
Years Experience
12
Telephone Number
+97466527083

HI,

I HAVE EXPERIENCE IN INFRA STRUCTURE PROJECTS, SICH AS HIGHWAY BRIDGES, FLYOVERS, ETC.

ALSO SOME EXPERIENCE OF METAL FENCING WORKS,COST ESTIMATION OF THE SAME WITH CIVIL WORKS.\

SOME EXPERIENCE IN OIL FIELDS SERIVCES ,MAINTENENCE WORKS.

KNOWLEDGE OF PRIMAVERA AND MS PROJECTS

 

ALL THE ABOVE MENTIONED JOB I CAN DO IT FOR ANY CLIENT

Assistant Bridge Engineer, Architects Engineers & Consultants Pvt Ltd, M/s. Aarvee Associates, Access Controlled Elevated Highway Project

START Date
END Date
  • Construction & supervision of day-to-day activities for all structural activities as per requirements.
  • Assist the key experts in understanding the design, extracting the details from the design and doing minor modifications in the design as when required
  • Assist the Senior Bridge Engineer in review of designs, construction methodology in accordance with the technical spec, requirement, and Project Implementation schedule.
  • Monitorthe progress of all major RCC casting works, Pre-stressing & Post stressing activities.
  • Keep proper track on t

Cost Controler, "KBR (Kellogg, Brown & Root) Design & Construction", Orbit Multi-Modal Study

M
Mark Sales 👤 Member for 18 years 1 month
START Date
END Date

Orbit Multi-Modal Study – Transport Planning, 2001 - 2003 This was a major transport study, the overall aim of which was to develop a long-term management strategy for the M25. Responsibilities included timesheet and hours monitoring, fee and cost monitoring (including resolving disputes with the client), plus input into project planning.

Planner (claim), Halliburton KBR, A13 DBFO Thames Gateway

M
Mark Sales 👤 Member for 18 years 1 month
START Date
END Date

A13 DBFO Thames Gateway (claim) – Highways DBFO, 2003 - 2004 Mark carried out the planning for this difficult project in its closing stages. This extremely challenging role on a project claim included interrogation of earlier versions in P3 of the programme for structures and highways and liaising closely with a claims consultant, client and contractors. Mark also provided historical time and cost breakdowns of staff hours for this Highways Agency project.