Railway
Quantity Surveyor, VINCI Construction , Crossrail
Evaluation of Compensation Events and general change management. ????? ????? ?????
Core Team Senior Planning Engineer, Galliford Try (Infrastructure Division), BFA, Airdrie to Bathgate
Working within the BFA I was responsible to the Contracts Manager for planning all the works in Scotland being carried out under that contract. Projects were planned through their full life cycle from GRIP Stage 3 to 8, including logic linked technical, commercial, procurement and physical work activities phased through option selection, option development/outline design, detailed design, construction testing and commissioning, scheme hand back and project closeout. The projects included complete station refurbishments, major re-roofing, train she
Senior Planning Engineet, BAM Nuttall, Borders Railway
I worked on the £300m Borders Railway Project for 22 months as part of the Project Team managing the Detailed Design / Construction Phase. I was principally employed on compiling and maintaining an integrated design and pre-construction programme from information collected from four separate design consultancies.
Anthony Edwards
Assistant Planner or Junior Planner or Planner or Project Planner, Transport for London (TFL), TfL
Tfl Project Planner Apprentice 2 and half year course. Will be on different placements
Kai Pyn Tan
I am responsible for civil planning, tracking site progression and liasing with site teams to develop detailed work programmes. I have knowledge with Primavera P6, Microsoft Project and TILOS. Able to prepare and submit monthly progress report. responsible to review and analyse subcontractors programmes.
Planner, MMC-Gamuda JV, KVMRT
- Planning
- Programme Update
- Review Sub-Contractor's Programme
- Progress Update
- Monitoring
- Prepare Progress Report