Access and Logistics Manager, The Nichols Group, Victoria Line Upgrade Project
Access and Logistics Manager
Victoria Line Upgrade, Metronet (2005-2007)
Access and Logistics Manager
Victoria Line Upgrade, Metronet (2005-2007)
Planning Team Leader
Cubic Transportation Systems Ltd. (1998 – 2005)
Employed by Cubic, at Contract Award in September 1998, to work on the Prestige project as part of the TranSys consortium (Cubic, EDS, ICL and WS Atkins). The project involved the design and supply of the ‘Oyster’ contactless smartcard system for London covering tube, trains, buses and trams over a 17-year franchise period. The project was, at the time, the largest PFI contract in the UK transport sector. Responsibilities included:
Since 1990 Paul has worked in a wide range of consultancy assignments in the role of Programme Controls Manager. Key rail assignments with Transport for London (TfL) / London Underground include the Victoria Line Upgrade project, Cooling the Tube programme and the Prestige project to design and supply the ‘Oyster’ contactless smartcard system for London covering tube, trains, buses and trams along with significant roles at THALES.
Date : December 11, 2008 to Present
Employer : NORTH LUZON RAILWAY CORPORATION
Primavera P3e, Project Control
As a Project Planer working with in central function team my main responsibilities are to provide programme planning support to Thameslink Central Engineering and Sponsor teams. Working on my own initiative and liaising with project’s teams to develop the best logic for the live programmes, collecting project data and transferring it in to programme plan. Updating activity schedule and creating project’s baseline. Generating Programme progress, Stage Gate, Coded reports and supporting engineering teams on accountability review meetings.
Planning ¨ Scheduling ¨ Risk Management ¨ Earned value Analysis
Collecting inputs related to project plan preparation and preparing the baseline schedule.
Monitor critical path & overall schedule on a daily basis. Prepare catch up plans, look ahead plans based on inputs from respective sources and report to Project Manager.
Optimum utilization of resources, Adherence to targets.
Follow up with clients for construction, checking drawings and quantities and ensuring that the calculations are accurate for the work.