Oil / Gas / Power

PLANNING ENGINEER, INDUSTRIALEXPORT, AQABA SOUTH PETROLEUM INSTALLATION PROJECT - AQABA, JORDAN

START Date
END Date

SITE – MECHANICAL / PLANNING ENGINEER

Project:AQABA SOUTH PETROLEUM INSTALLATION PROJECT - AQABA, JORDAN. Petroleum products loading/unloading and storage facilities mainly consisting of:
2 pcs. 30,000 cb.m. capacity each Crude Oil storage tanks (floating roof type), 2 pcs. 20,000 cb.m. capacity each Gasoline and Kerosene  storage tanks (floating roof type), 2 pcs. 20,000 cb.m. capacity each Diesel storage tanks (cone roof type), 2 pcs. 20,000 cb.m. capacity each Fuel Oil storage tanks (cone roof type), 2 pcs. 3,000 cb.m.

CONSTRUCTION/PLANNING ENGINEER, INDUSTRIALEXPORT, OIL-GAS SEPARATION PLANT AT AKSHABULAK, KAZAKHSTAN

START Date
END Date

CONSTRUCTION/PLANNING ENGINEER at AKSHABULAK, KAZAKHSTAN

Project: OIL-GAS SEPARATION PLANT mainly consisting of: Manifold, Separator Vessel, Scrubber Vessel, Heat Exchangers, Oil Storage Tanks, Pipe Rack, Flare System, Transfer Pump Houses, Booster Pump House, Pig Launcher and Pig Receiver skids, Diesel Generator Sets and Diesel Storage tanks, Water Treatment Plant, Air Compressors, PLC, Fire Fighting facilities and Water Storage Tanks, etc.
Client: RWE-DEA (GERMANY).

Responsibilities:

Supervising, coordinating an

HEAD OF PLANNING AND CONTROL DEPARTMENT, INDUSTRIALEXPORT, OIL AND GAS VARIOUS PROJECTS (HEADOFFICE POSITION)

START Date
END Date

HEAD OF PLANNING AND CONTROL DEPARTMENT

Responsibilities:

Coordinating the company’s Planning Department for the following main activities:
Projects scheduling using Primavera Project Planner.
Work Breakdown Structure (WBS) defining.

Defining milestones.

Assigning original duration and logical relationship to activities.

Allocating budgets.

Assigning and leveling resources.
Updating the progress, keeping control of the budgets.
Identifying and recommending corrective measures as to keep the projects within the orig

PLANNING AND CONTROL MANAGER, FUNG TAI ENGINEERING Co., PETROLEUM PRODUCTS JETTIES RECONSTRUCTION at APAPA, LAGOS, Nigeria

START Date
END Date

PLANNING AND CONTROL MANAGER

Company activity field :

EPC Contractor for PETROLEUM PRODUCTS STORAGE AND TRANSPORT FACILITIES.

Main Project: PETROLEUM PRODUCTS JETTIES RECONSTRUCTION at APAPA, LAGOS, Nigeria.

WORKSHOP MANAGER, INDUSTRIALEXPORT, FABRICATION OF EQUIPMENT AND STRUCTURES FOR OIL FACILITIES

START Date
END Date

WORKSHOP MANAGER

Company activity field :

Romanian leading EPIC Contractor for COMPLEX CHEMICAL/PETROCHEMICAL PLANTS and REFINERIES.

The production workshop has been implemented for fabrication of PIPING PREFABS, STORAGE TANKS, PRESSURE VESSELS and STEEL STRUCTURE, mainly for export to Company’s overseas construction sites.

Responsibilities:

Coordinate, plan and manage all Workshop’s activities.

SNR PLANNING ENGINEER, Saipem, CONSTRUCTION FOR KASHAGAN OIL FIELD

START Date
END Date

SNR.PLANNING AND CONTROL ENGINEER

Company activity field:Onshore and Offshore Oil and Gas facilities construction.

Project:PIPE RACKS, PILES, FLARES, JACKETS, BARGES construction and Load Out at Kuryk Base, Kazakhstan (onshore) for Kashagan Oil Field (offshore).

Client:AKCO (AGIP Kazakhstan Oil Company).

Responsibilities:

Developing L4-5 Project Schedule, using PRIMAVERA PROJECT PLANNER v 3.1.

Progress monitoring and measurement.

P3 schedule updating and analysis again

PLANNING ENGINEER, Chiyoda Technip JV (Technip), Ras Laffan, QATAR QGX - LNG production and facilities

START Date
END Date

PLANNING ENGINEER

Project: LNG production, storage and loading installations at Ras Laffan, Qatar: LNG production trains, LNG storage tanks, BOG compressors, sulphur recovery and storage, LNG piping corridor, Jetty construction, LNG Loading Arms and the related LNG loading facilities.

Client: QatarGas

Responsibilities:

Monitoring and integrating various subcontractors’ schedules (Subprojects) into the Project Overall Schedule (Project Group), using PRIMAVERA PROJECT PLANNER v 3.1.

Critical Path analys

Senior Project Engineer, Acergy Norway AS, Stavanger, Norway, Langeled Pipeline - 1166 km, 44"och 42" pipelines from Ormen Lange Norge till Easington, UK.

START Date
END Date

 

  • Working within the Rigid Pipeline section, and responsible for assisting sub-sea pipeline related projects, tenders and studies.
  • Review Client's technical documentation and requirements during the bid phase and ensure an adequate standard of technical documentation are prepared.
  • Perform and/or supervise the correct execution of sea-line design and installat

Lead Project Planner, Alstom Power Systems GmbH, 2x800MW Coal Fired Power Plant Eemshaven A+B, Eemshaven, Netherlands

START Date
END Date

Working as Lead Project Planner, P6, claims, schedule risk analysis, EOT Claims, detailed planning, developing progress measurement system, progress reporting, interface management, lean construction,