Planner Co-ordinator, Koch Transportechnik, Zayzoun extension
Co-ordinate consortial planners, physical progress of works , master scheduling, etc
Co-ordinate consortial planners, physical progress of works , master scheduling, etc
Lead planner for Nasserieh and Zayzoun extension power plants.
Master schedules / Subcontractors folow up / Physical works progress / Consortium reporting / Client reporting / etc
¨ Prepared contractually required planning, scheduling and control procedures for BP Global- NA offshore Project, SNC Lavalin- Kirby project, and for Shell Canada – Carmon Creek & AOSPE Project.
¨ Issued the WBS, resource loaded schedules, and labour plans as part of project controls dept.
Planning Engineer - Construction. Short term post to assist in closure of construction schedule and assist in development of a commissioning programme.
Develop M E & I build schedules for the Flue Gas Desulphurisation new build on a fossil fuel power station at Fiddlers Ferry Cheshire
Maintenance Planning Engineer - Rotating Equipment. Engaged as a Shift Supervisor, mechanical . Went on to assist in development of a new planning arm of the maintenace group to set up and operate the rotating equipment planning section.
Emphasis on GE and GE derivative Frame 5 gas turbines in single shaft format for power generation and twin shaft format for mechanical drive units. Elliot centrifugal gas compressors. General gas plant rotating equipment maintenance.
Maintenance Planning Engineer - Centreline. Maintenace overhaul on 660Mw Steam Turbine at Hinkley Point B Nuclear Power Station
Construction Planning Engineer with AMEC at West Burton new build power station. 3 x 440Mw co-generation units