Junior Scheduler, Alliant, Nuclear Plant Decommission and Decomtamination
p { margin-bottom: 0.08in; }
- Project expense management for transition on a multi-million multi-year nuclear project
-
Managed transition schedule, 1130 activities, with P6
p { margin-bottom: 0.08in; }
Managed transition schedule, 1130 activities, with P6
Support project managers throughout the organization to ensure that effective planning and key project controls are in place starting from the initial project planning through the execution phase EPC projects.
To apply my extensive knowledge in oil and gas project as a Planning and project control expert/manager in highly reputed and professional organization. My expertise include 14 years of Managing, organizing , planning , scheduling and controlling mega projects in main phases (Engineering, procurement , construction and commissioning) can be a valuable asset for my company .
Liaise with client engineering, process and inspection departments. From equipment work list, process clean requirements, and pressure vessel scheme of inspection sheets, specify equipment such as reactors, columns, drums and heat exchangers using P+Ids, piping specs, vessel drawings and blinds lists. Identify material that will be needed to isolate, open, clean, inspect, repair and test equipment. Interface with the clients sub contractors on scaffold access and insulation removal. Specify material for equipment closure and hand back.