Project Planner, "Planning, Sasol Technology Secunda South Africa", UTILITIES INFRASTRUCTURE

START Date

 

  • Experience:
    • Project Planning & Scheduling
    • Safety & Management
    • Education & Training
    • Accounting
  • PSP (Planning & Scheduling Professional) Certification - AACE (April 2011)
  • Primavera Pertmaster Risk Analysis Course – Oracle (Feb 2011)
  • NEC3 Course – Worley Parsons (Feb 2011)
  • Project Management Best Practices Course – IPA Institute (Nov 2010)
  • Commissioning for Commissioning Managers Course – SASOL (Feb 2010)
  • Introduction to Commissioning – SASOL (Feb

Oil & Gas Senior Planning Engineers - Primavera, Subsea 7, Seven Borealis

START Date
END Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Forensic Analysis)
500

The Seven Borealis project was a complex multi-phase endeavour incorporating multiple sub-projects with operations spanning the globe with a total budget of over $600 million for the construction and commissioning of a technically advanced offshore construction vessel. Responsible for creating plans to coordinate all project elements and phases through an Integrated Master Schedule and Earned Value progress management system. Provided Board level status updates, briefings and forecasts.

Planning Subject Matter Expert, BG India, BG Operations India

START Date

Providing consultancy services to assist to BG with development and implementation of their global Integrated Planning and Scheduling (IAPS) initiative. IAPS was designed to provide a structured approach to planning CAP activities over multiple time horizons from 8 years to 2 weeks with the level of detail in the plan being increased as the plan matures.

First phase was development of procedures, guidelines and standards which had been created for the pilot scheme in Trinidad and Tobago.

Senior Planner - Operations Suppport, BP Angola, BP Angola Operations

START Date
END Date

Answering directly to the Onshore Operations Manager, responsible for development of all operations schedules including planned maintenance and emergent work (breakdown and corrective) on the Greater Plutonio FPSO. Using Primavera and Maximo systems to drive work through from initial work request to execution. Also worked with production manager and his team to developed campaign schedules, grouping tasks according to system availability and redundancy.

Hookup & Commissioning Planner, BP Angola, Greater Plutonio FPSO

START Date
END Date

Development of the Level 3 integrated Hook-up,  commissioning and start-up schedule of approx 250,000 manhours. This included all interfaces with Sub-sea and FPSO  mooring activities including riser tie-ins, umbilical tie-ins and flexible riser connections.

George Hislop

First Name
George
Last Name
Hislop
Professional Since
Oldest experience
Years Experience
41
Telephone Number
+61 (0)45 0450497277
LinkedIn Profile
view?id=52809637

Integrated Planning in operational Oil & Gas Assets

Business Development

Management Control and Reporting Systems

P6 Training

Bringing your safety case to life

Commissioning & Startup Planner, Primavera P3, MARATHON OIL, ALBA Gas Plant

START Date
END Date

Responsible for the development of a system-based commissioning and start-up plan for a new Gas Plant in EG. The first stage included Power Generation, Gas Compression and Injection packages along with associated utilities (Flare, Drains, Air and Utility Water etc). The second stage involved commissioning of a new Gas Plant and LPG Storage tanks.

 Commissioning activities were resourced to provide manning requirements and progress reports by manhours.

Commissioning Planning Engineer, TOTAL, Coke & Sulfur Handling Project

START Date
END Date

Developed a full pre-commissioning and commissioning network down to task and discipline level with coding structure to produce reports by System, Contractor, Discipline and Project Phase.

The project involved the commissioning of a Conveyor System to transport Coke and Sulfur Products from the main Upgrader Complex to shipping jetties.

Commissioning Planning Engineer, Total, Sincor Upgrader Project

START Date
END Date

Working as part of the Project Management Team developing the Commissioning Programme for the Upgrader Complex which comprised a Desalting and Crude Distillation Unit, Delayed Coking Unit, Sulfur Recovery Unit, Gas Sweetening Plant, Mild Hydrocracker and Hydrogen Manufacturing Unit (project total ~$4.2 billion).

Produced Integrated and summarised programmes to system level from the more detailed programmes of Main Contractors as well as the Operating Group. Preparation of reports and presentations to Commissioning Manager and Partnership Directors.

Planning Engineer, BP, Overhauls Services - Multiple Projects

START Date
END Date

Directed and advised in the selection of a front-end package to allow BP to move from an Artemis 6000 system running on an HP mini system to a PC bases Artemis 7000 system quickly and smoothly. Then expanded this system by writing programmes and menu systems to meet the refinery specific planning and reporting needs. This system was later replaced by Primavera (P3).

While working for the Overhauls Services Branch at BP I have created, monitored and reported on plans for a wide range of maintenance and capital project works for execution during plant shutdowns.