Oil / Gas / Power
Claims Preparation, Evans & Peck, Power Station Construction for Endel
Preparation of Extension of Time Claim for Contractor constructing two 50MW Power Stations in New Caledonia
Richard Croxson

Richard is a chartered quantity surveyor and barrister* with twenty years experience in the construction industry. He has provided commercial and dispute advice for employers and contractors as well as preparing and defending claims for extensions of time, disruption and prolongation for domestic and international arbitration. He has also prepared contracts for major construction projects and has experience in building, ship building, civil, heavy engineering, power, rail, water, oil and gas works.
Shutdown Planner, OTS, Foster Wheeler, Brunei LNG, Nigeria LNG, SABIC PMT, LNG Shutdown, EO-EG.SMPO,LOP De-Bottleneck
Shutdown Planner, OTS, Foster Wheeler, Brunei LNG, Nigeria LNG, SABIC PMT, LNG Shutdown, EO-EG.SMPO,LOP De-Bottleneck
Senior Planer & Cost Control, PT. Truba Jaya Engineering / PT. Truba Jurong Engineering, EPC Work for NDD Area 12 Project (Earthwork, Road & Canal, Bridges, Pipings Work, Mechanical Work, Electrial Work, Instrumentation Wirk) forr. 588 Well
Project Planing & Cost Control at PT. Truba Jaya Engineering (Power Plant, Oil & Gas, Industrial Plant, Minin Plant
anoushiravan amiri
Head of Planning Department
Petropart Co.– (www.petro-part.com)
Expert (Planning & Project Control), Tondgooian Petrochemical co., tondgooian petrochemical co.
Planning Engineer/Analyst/ Network Administrator
Shahid Tondgooian Petrochemical Co. (STPC)– (www.stpc.ir)
Expert (Planning & Project Control), Namvaran Consulting Engineering Co, jam petrochemical co.
Pagination
- Previous page
- Page 890
- Next page