Oil / Gas / Power

Planner, PEDEC, MIS& Azar oil fields development projects, Kish gas field development project

START Date
END Date

Petroleum Engineering and Development Company (PEDEC) manages and supervises the implementation of major oil and gas projects in Iran. I was involved in different Oil and Gas Field Development Projects including: Azar, Kish, and Masjed-I-Suleyman. I was started my job as a technical data collector. I built my skills and slowly and surely was promoted.

Project Services Cost & Schedule, John Brown Engineers and Constructors Limited, British Gas - Rough Storage Project

START Date
END Date

John Brown Engineers and Constructors Limited (1980-1986)

 

British Gas - Rough Storage Project: Worked within the Oil & Gas Industry in the Project Services Team involved in estimating, planning, cost control and materials reporting.

At project completion joined the Client's Project Reconciliation Team.

 

Senior Planning Engineer, NCOC (Total), Kalamkas Sea Project

START Date

Roles / Responsibilities / Achievements:

 

  • Support Kalamkas Sea Concept Select Phase activities
  • Consolidate input from studies for application in various schedules
  • Prepare Option and Selected Concept schedules
  • Ensure consistency with the integrated schedule prepared by the Planning Directorate

Senior Planning Engineer, Cameron, Various Subsea Deepwater Development Projects

START Date
END Date

Roles / Responsibilities / Achievements:

 

  • Adapted and developed preliminary work breakdown structures (WBS) to suit the specific job scope
  • Played a key role in the development and maintenance of Pre-tender and Tender schedules for new projects
  • Development and Maintenance as well as Level 3-5 schedules for Engineering, Equipment manufacturing / fabrication, Testing and Installation.
  • Preparation of Resource Loaded schedules and generation of S-curves and histograms etc
  • Factory