Oil / Gas / Power

Sr. Projects Management & Control Engg., EQUATE Petrochemical Co., Engineering Deptt. (HO)

A
Amjad Fraz 👤 Member for 14 years 9 months
START Date

Experience in Detail

 

·Name of the company : Equate Petrochemical Co. Kuwait (E&C Department)

  • Company’s specialization in : EQUATE was established in 1995 and began production in November 1997. Shareholders: Dow Chemical Company (42.5%), PIC (42.5%), Boubyan Petrochemical Company (9%) and Qurain Petrochemical Industries Company (6%). i.e. (http://www.equate.com)
  • Post: Sr. Projects Management & Control Engg.

Snr. Project Planning Engineer, Kaefer C&D Ltd, Ratcliffe REU & Asbesto's Removal Project

START Date

Responsible for the Planning of a Major upgrade at the Ratcliffe Power Station Uk, working as part of the kaefer C&D team to provide the service of: Access, Thermal Insulation, Industrial painting and Cleaning and Civil & Construction Works. I am responsible as Snr. Project Planner to schedule all relevent task and track progress and productivity.

As Part of this I am also the lead Planner of the removal of asbesto's material at Ratcliffe Power Station.

Ryan Lytollis

First Name
Ryan
Last Name
Lytollis
Professional Since
Oldest experience
Years Experience
1
Telephone Number
07805721648

P6 Planner working with multi-discipline contractors; covering the full range of services, Scaffolding, Insulation, Painting and Mechanical.

Senior Planner, Ansaldo Energya, Power Plant 3x127,8 MW

START Date
END Date

Turbo-generator 3x126,7MV with electrical substation (workshop, administration building, post of centralized control with integral system : energy equipments, gas, gas oil, various water system, electrical,  measures and telephony system, supervisory and security system and many other services).

Senior Engineer, GTP, Various

START Date
END Date

Formulating detailed cost estimate for piping and equipment disciplines.

Sharer in work estimate.

P3 Schedule preparation, based on engineering, materials delivery and procurement schedule Preparation documents: Schedule development, Schedule resource loading & Leveling andwork progress control :

- Gas storage tank (sphere : 2000 m3)

- Replace an existing pipeline (9,2 km of 10”,12”, 16” and 20”)

- Enhanced oil recovery in R / Baguel,

Assitant Techinical Officer, GTP, Various

START Date
END Date

Various

Project Description: Oil storage tanks (11) with security system, El Eulma and Oily separator center, TFT South of Algeria.

Responsibilities/Tasks:Work progress control (using earned value), scheduling and forward project, schedule analysis and monthly report preparation.

 

Project Description: Diesel power plant, Illizi.