Principal Planner, Origin Energy, APLNG Coal Steam Gas, Gladstone Project
Principal Planner - APLNG - Coal Steam Gas Project, Water Solutions Section. Responsible subprojects of the Water Solutions section.
Principal Planner - APLNG - Coal Steam Gas Project, Water Solutions Section. Responsible subprojects of the Water Solutions section.
Experience in Detail
Responsible for the Planning of a Major upgrade at the Ratcliffe Power Station Uk, working as part of the kaefer C&D team to provide the service of: Access, Thermal Insulation, Industrial painting and Cleaning and Civil & Construction Works. I am responsible as Snr. Project Planner to schedule all relevent task and track progress and productivity.
As Part of this I am also the lead Planner of the removal of asbesto's material at Ratcliffe Power Station.
P6 Planner working with multi-discipline contractors; covering the full range of services, Scaffolding, Insulation, Painting and Mechanical.
Turbo-generator 3x126,7MV with electrical substation (workshop, administration building, post of centralized control with integral system : energy equipments, gas, gas oil, various water system, electrical, measures and telephony system, supervisory and security system and many other services).
Formulating detailed cost estimate for piping and equipment disciplines.
Sharer in work estimate.
P3 Schedule preparation, based on engineering, materials delivery and procurement schedule Preparation documents: Schedule development, Schedule resource loading & Leveling andwork progress control :
- Gas storage tank (sphere : 2000 m3)
- Replace an existing pipeline (9,2 km of 10”,12”, 16” and 20”)
- Enhanced oil recovery in R / Baguel,
Various
Project Description: Oil storage tanks (11) with security system, El Eulma and Oily separator center, TFT South of Algeria.
Responsibilities/Tasks:Work progress control (using earned value), scheduling and forward project, schedule analysis and monthly report preparation.
Project Description: Diesel power plant, Illizi.