Oil / Gas / Power

Craig Ferriday

First Name
Craig
Last Name
Ferriday
Oldest experience
Years Experience
14
Telephone Number
07588275855

Senior Planning Engineer working at Fabricom Offshore Services Ltd in Newcastle.

Extensive knowledge of Subsea Umbilical Manufacturing

Purchasing, cost control and Expediting experience.

Management Qualification.

Planning Management history

Extensive knowledge of Primavera P6, Microsoft Project and standard Computer software packages

Over 18 years in the Subsea sector.

Manufacturing Planner, Duco Ltd (Part of Technip Group), Multiple Clients

START Date
END Date

 

Manufacturing Planner

The role combined some duties of a Project Planner, but my main responsibility was controlling the Manufacturing workload throughout the factory.  Procurement of raw materials, advising the Production Manager and other departments of daily manufacturing priorities / activities.  Attending daily production meetings to review production performance, solve Logistical problems.

<

Logistics Engineer, Duco Ltd (Part of Technip Group), Agip Safueiro, BG maria, Burullus Simian / Sapphire, Chevron Kuito, Shell Pohokura, Shell Saderi, Shell Serai, Total AKPO HFL's

START Date
END Date

Areas of Responsibility: Logistics Engineering.

Role Responsibilities:

  • Duties include the co-ordination / management of manufacturing activities from contract award to loadout.  This includes engineering review and analysis of non-conformance reports, facilitation of technical review meetings and control of project costs including variation orders.  Co-ordinating fitting of hardware and final testing inline Duco’s Quality systems, ISO9001 and API requirements.

Project Engineer, Duco Ltd (Part of Technip Group), Petro SA South Coast Gas, Talisman Duart, Cameron Husky HFL's

START Date
END Date

Areas of Responsibility: Project Engineering

Role Responsibilities:

  •  Working in a project team, responding to a Project Manager, duties included review and interpretation of client specifications; generating specific project deliverable drawings and documents in line with client specifications; liaising with manufacturing to provide relevant information to produce umbilicals and associated hardware on time and within budget, ensuring both quality and reliability.
  • Advising project status and rep

Senior Planning Engineer, Fabricom Offshore Services Ltd, Dana Petroleum - De Ruyter, Maersk Gryphon

START Date

Areas of Responsibility: Control the Planning on Major Projects.

Role Responsibilities:

  • Assisting the Lead Planner in standardising systems across Fabricom during its growth.
  • Utilising software Primavera P6 in developing Schedules from FEED studies, through to detailed design and construction for major offshore clients.
  • Manpower resource scheduling in line with available manning levels.
  • Project scheduling and reporting through using earned value analysis techniques.

Logistics Supervisor, Duco Ltd (Part of Technip Group), Chevron Agbami, PDVSA Dragon HFL's, Vetco Gray Kipper Tuna

START Date
END Date

Supervising a small team of four Logistics Engineers in controlling the umbilical manufacture within the Manufacturing facility.

  • Performing the duties of a Logistics Engineer:
  • Engineering review and analysis of non-conformance reports, facilitation of technical review meetings and control of project costs including variation orders.  Co-ordinating fitting of hardware and final testing inline Duco’s Quality systems, ISO9001 and API requirements.

Logistics / Planning Manager, Duco Ltd (Part of Technip Group), BP Andrew Kinnoull, BP Skarv, Chevron Agbami, Encana Deep Panuke, Mearsk Dumbarton & Lochranza, Murphy Azurite, Talisman Auk North, Total Islay

START Date
END Date

Areas of Responsibility: Project / Manufacturing & Applications Planning, Logistics Engineering and Project Shipping.

Role Responsibilities:

  • Overseeing tender plans and project planning to ensure that the requirements of the client are achieved.
  • Overall planning management of the factory ensuring the factory runs at optimum capacity.
  • Ensuring umbilicals are manufactured and tested in line with the client’s specifications and to ISO systems.
  • Strategic monthly forecasting for production man-hour requirements, machine capacity, and rev

Technology Planner, Wellstream International Ltd, Research & Development Projects

START Date
END Date

Areas of Responsibility: Setup and control the Planning function within the Technology department

Role Responsibilities:

  • Implementation of Wellstream planning systems within the Technology department utilising software Primavera P5.
  • Generation of Research and Development Projects for new pipe designs to enhance Wellstream’s future market strategy.

Reporting targets and results during the life of projects.

Andrew Ponting

First Name
Andrew
Last Name
Ponting
Years Experience
0

I have been working within Project Controls for six years.  I spent a year doing Cost Engineering, Risk and Change Control.  The last 5 years I have been a Planning Engineer.  My latest project which I have been on for two and half years is a £125 million, Nuclear Construction Project.  I undertake all aspects of Planning, I am involved in from Earned Value Anaylysis, Schedule Scrutiny, Interactions with the contractor, the project managers and Senior Mnagement. In addition I am a member of the Association of Project Managers,