Oil / Gas / Power

Assistant Manager - Project Controls, Eiffage Construction Metallique, Ofon Phase II

START Date
END Date

Eiffage Oil & Gas Construction Company, Aveon Offshore Facility, Rumuolumeni, Port Harcourt

(Project: Total E & P- OFON Phase II Project)

Offshore Planning /Project Controller (July. 2011-Till Date):

Mansoor Shaikh

First Name
Mansoor
Last Name
Shaikh
Professional Since
Oldest experience
Years Experience
3

Lead Project Controls, Contract Management & Cost teams as part of PMT / PMC or major EPC contractor team member on large multibillion dollar projects in the oil & gas industry both onshore & offshore works, grass root refinery & process plant construction (upstream and downstream), major power plants, nuclear plants and Industrial projects such as large sewage treatment plants based on reverse osmosis technology.

Lead Planning & Scheduling Engineer , Shair & Partners, Khafji Field Development Plan, Phase 1

START Date
END Date

 

Khafji Field Development Plan, Phase 1 Design & construction of offshore platforms (Y1-B and Y2-B) & flow stations, 36" undersea Crude Oil Transmission Line from Y2-B and 42" undersea Gas Transfer line from Y2-B intrafield Oil & Gas gathering lines, On-shore Inlet Separator System and On-shore Gas Compression & Processing Facilities. The projects also included installation of three (3) Power Distribution Platforms (PDP) & one (1) IWJ-5.

Team Leader - Project Planning & Scheduling, AMEC Americas, FFT-CFSP Project

START Date

 

FFT-CFSP ProjectThe project involved cleaning of Lake Mildred in Fort McMurray and separation of matur/fluid fine tailings from the water and dumping on designated areas. It involved design and procurement of new onshore and offshore facilities involving centrifuge buildings, polymer, gpsum and screening facilities, dredgers, barges and floating pipelines along with ice breaking systems and also included take away and loading conveyors for trucking to designated areas as per regulations of the Canadian Government.

Senior Planning & Scheduling Engineer, WorleyParsons, Integrated Gas Development (IGD) Project – Das Island

START Date
END Date

 

B. Integrated Gas Development (IGD) Project – Das IslandThe project involves both offshore and onshore works with building new jetties, jackets, breakwater and flaring facilities on the offshore part and building most of the facilities to be built on the newly reclaimed area of land which will house the 3 trains for Gas dehydration and Compression interlinked with the existing utilities.

Assistant Manager, Larsen & Toubro Ltd., 66KV Electrical Substation

START Date
END Date
  • Managed a team of 180 staff including Engineers, technicians and un-skilled workers for the electrical installation and the MEP installation works in the electrical substation projects. Succeeded in building and maintaining a motivated team to achieve the project objective.
  • Managed technical teams to execute stringent work schedules like outage maintenance work of Transformers and complete the works safely on time.
  • Liaising with the sub-contractors for the completion of site execution works within schedule.