Alliance Planner & Scheduler, Monadelphous Engineering Construction, & Oil & Gas Projects
Scheduling and planning of project works, preparing project plans & schedules, prepare, maintain & report status on all types of schedules and progress curves.
Scheduling and planning of project works, preparing project plans & schedules, prepare, maintain & report status on all types of schedules and progress curves.
Reponsible in Preparing detailed baseline schedule based on the project requirements.
Plans, review and make thorough study of the project and define its requirements.
Collaborate with the Quantity surveyor to obtain the detailed quantities of the specific project.
Prepares execution plan on how to do the project required by the client and define whats the resources
are needed for each scope of work. And see to it that resources are sufficient enough to complete the job.
And make sure that material availability will conform with project requirement.
Lead-Planner Scheduler - for BP Refinary in Toledo Ohio for a four unit maintenaince outage
Prepared baseline schedule, monitored, analized and repoerted on a cost/resource loaded CPM schedule using SureTrak 3.1 for Iroquois Gas Transmission System. Prepared As-Planned vs. As-Built Schedule Analysis, charts and graphics.
PCO Electrical Sector Program(Completed 2006), Baghdad, Iraq: As Project Control Engineer for Iraq Power Alliance (joint venture between Parsons Brinckerhoff and Parsons E and C), developed baseline schedules and provided planning and analysis expertise for 444 generation, distribution, and transmission projects throughout Iraq with total budget of $2.4B encompassing more than 17K activities.
Progressed through series of positions with increasing responsibilities based on exemplary performance for Kellogg, Brown, and Root (KBR), working with US Military Command in locations throughout Iraq and orchestrating scheduling for numerous projects valued at hundreds of millions of dollars:
Responsible for the integration of P6 to EcoSys EPC, administration of the Earned Value tool, reviewing the quality of the P6 schedule data being imported into EPC, configuration control of P6 to enable various EPC EV reports.
Responsible for maintaining security within a P6 database that is shared with consortium partners, performing FOAK efforts within the database, creating and modifying global changes, implementing large scale changes to activity details using SDK files, providing technical support to end users, and testing the features and functionality of the