Project Planning and Controls Senior Engineer, Consortium of Sazeh Consultants & Jahanpars Engineering & Construction Companies, Extended feed, detail design, procurement, construction, pre-commissioning and commissioning of Bid Boland II Gas Treating Pl

START Date
END Date
  • Directing projects planning and control engineers
  • Performing delay analysis and surveying the root causes and tacking corrective actions 
  • Administration and merging projects’ EPCC time schedules to develop integrated program time schedule (Primavera Project Management software: environment consisting over 70,000 activities )
  • Developing Project WBS and WBS procedure
  • Developing Planning and Scheduling procedures
  • Preparing project cash flow,       
  • Performed detailed analysis of actual cost/man-hour ve

Project Planning and Controls Senior Engineer, Consortium of Sazeh Consultants & Jahanpars Engineering & Construction Companies, Extended feed, detail design, procurement, construction, pre-commissioning and commissioning of Bid Boland II Gas Treating Pl

START Date
END Date
  • Directing projects planning and control engineers
  • Performing delay analysis and surveying the root causes and tacking corrective actions 
  • Administration and merging projects’ EPCC time schedules to develop integrated program time schedule (Primavera Project Management software: environment consisting over 70,000 activities )
  • Developing Project WBS and WBS procedure
  • Developing Planning and Scheduling procedures
  • Preparing project cash flow,       
  • Performed detailed analysis of actual cost/man-hour ve

Project Planning and Controls Senior Engineer, Consortium of Sazeh Consultants & Jahanpars Engineering & Construction Companies, Extended feed, detail design, procurement, construction, pre-commissioning and commissioning of Bid Boland II Gas Treating Pl

START Date
END Date
  • Directing projects planning and control engineers
  • Performing delay analysis and surveying the root causes and tacking corrective actions 
  • Administration and merging projects’ EPCC time schedules to develop integrated program time schedule (Primavera Project Management software: environment consisting over 70,000 activities )
  • Developing Project WBS and WBS procedure
  • Developing Planning and Scheduling procedures
  • Preparing project cash flow,       
  • Performed detailed analysis of actual cost/man-hour ve

Quality Control Inspector, (KPIOS)(KUWAIT PIPE INDUSTRIES AND OIL SERVICE & ISO PLUS MIDDLE EAST)., Oil & Gas Pipe Line Project.

START Date
END Date

WORK EXPERIENCE:

Currently working as aQC INSPECTOR AT (KPIOS)(KUWAIT PIPE INDUSTRIES AND OIL SERVICE & ISO PLUS MIDDLE EAST).

Jan 2012 till now.

 

·         Projects Undertaken:

Kyle Hammer, PMP

First Name
Kyle
Last Name
Hammer, PMP
Professional Since
Oldest experience
Years Experience
7
Telephone Number
+1.713.705.3631
LinkedIn Profile
http://www.linkedin.com/pub/kyle-hammer-pmp/21/8b7/4b5
  • Bachelor of Science in Construction Science from Texas A&M University, December 1988
  • Currently in twenty-fourth consecutive year as project controls engineer, virtually all of which has been with Primavera products in the hydrocarbons and chemicals sectors
  • Project Management Professional (PMP®) certification number 68044, continuously in good standing June 2003 to present
  • Authorized Oracle University instructor for Primavera P6, continuously March 2003 to present
  • Member of Oracle|Primavera’s Product Strategy Council for

Principal Planner, Primavera Administrator, KBR, Departmental staff

START Date

KBR

Houston, TX

Primavera Administrator and Instructor, Global Functional Oversight

Mar ‘05 to present

Principal Planner and Primavera P6 business-side administrator for KBR’s Hydrocarbons Group, which operates one of the world’s largest single-instance P6 databases in the energy/chemicals/hydrocarbons market sector, and contains over 30MM activities (excluding baselines) and nearly 500 discreet users located in ~18 countries.  The only authorized Oracle University P6 i

Principal Planner, Primavera Administrator, KBR, Departmental staff

START Date

KBR

Houston, TX

Primavera Administrator and Instructor, Global Functional Oversight

Mar ‘05 to present

Principal Planner and Primavera P6 business-side administrator for KBR’s Hydrocarbons Group, which operates one of the world’s largest single-instance P6 databases in the energy/chemicals/hydrocarbons market sector, and contains over 30MM activities (excluding baselines) and nearly 500 discreet users located in ~18 countries.  The only authorized Oracle University P6 i

Mohammad Ayaz Khan

First Name
Mohammad Ayaz
Last Name
Khan
Professional Since
Oldest experience
Years Experience
43
Telephone Number
+965-993-605-10
LinkedIn Profile
No
Facebook Profile
Twitter Profile
No

 

WORK EXPERIENCE:

Currently working as aQC INSPECTOR AT (KPIOS)(KUWAIT PIPE INDUSTRIES AND OIL SERVICE & ISO PLUS MIDDLE EAST).

Jan 2012 till now.

 

·         Projects Undertaken:

Quality Control Inspector, ISOPLUS Middle East, Oil & Gas Pipe line from Mena ahmadi to kadma kuwait

START Date
END Date

 

WORK EXPERIENCE:

 

· Currently working as aQC INSPECTOR AT (KPIOS)(KUWAIT PIPE INDUSTRIES AND OIL SERVICE & ISO PLUS MIDDLE EAST).

Jan 2012 till now.

 

· Projects Undertaken:

· Working in Isoplus, Kuwait a reputed pre-insulated pipe production company as a QC Inspector (KOC PROJECT) for Polyurethane Thermal Insulation & Moisture Monitoring System. The project is for Installation of LSFO, FG and Gas oil pipelines from MAA to Subiya & Doha Power Stations.