Oil / Gas / Power

Project Planner, KDI OIL AND GAS SECONDED TO Agip Nigeria, Laying of 10.5 KM dual string 6” flowline from Ashaka D location to Kwale flow station (seconded to ENI AGIP)

START Date

• Provided planning support to project management team. • Updated the progress of the work and prepare reports on scope and schedule of work done in accordance with cost data. • Produced Earn value analysis to evaluate project performance and predict final results of project to project management team using P6. • Prepared the analysis for work scope comparisons and scheduling criteria between multiple projects using P6. • Generated critical path analysis on all projects and normalised the project schedule. • Compared the logic between the baseline schedule and the current schedule.

Rengasamy Prabhu

First Name
Rengasamy
Last Name
Prabhu
Professional Since
Oldest experience
Years Experience
20
Telephone Number
00918050460531

I am a Post graduate in Chemistry and Post graduate in Ecology and Environment.

Presently I am working as a Planning manager in MaxPro Engineers Pvt Ltd, Banglore, India

Responsible for Planning, Scheduling, Monitoring and control of the Projects. Fortnight and monthly Progress report preparation, S-Curve, Critical Acttivity Monitoring ETC,

Deputy Manager - Chemical, Consolidated Fibers & Chemicals Ltd, Haldia., Consolidated Fibers & Chemicals Ltd, Haldia

START Date
END Date

DEPUTY MANAGER (CHEMICAL)

·         Responsible for the day-to-day operation, daily maintenance for the smooth running of the plant and coordination with utility people.  The total plant is controlled through DCS and PLC systems.

·         Sophisticated YOKOGAWA MXL(DCS) system .The systems include tripping systems to avoid accidents.

Manager Technical, Alexandria Fiber Co. S.A.E.Egypt, Alexandria Fiber Co. S.A.E., Egypt

START Date
END Date

MANAGER (TECHNICAL CELL)

·         AFCOis established in 2004 and I am working in its gross root stage. It is a group company of ADITYA BIRLA GROUP.

·         Main Responsibilities include with purchase activities related to chemical area, Water treatment and Effluent treatment plants.

Water Treatment Specialist, Harouge OIl Operation, Libya, Harouge Oil Operations

START Date
END Date

·         The purpose of the hire is to run the potable water plants to produce the potable water for the plant and camps.  The potable water production is done by the Electro Dialysis Reversal process as well as Reverse Osmosis units.

Area Planning Manager, MaxPro Engineers Pvt Ltd, Indian Rayon

START Date
END Date

·        

 

·         Provide Project Management support in the development of integrated project schedule, leading to the creation of the overall project portfolio baseline schedule and its subsequent maintenance.

ehab abd el-latif

First Name
ehab
Last Name
abd el-latif
Professional Since
Years Experience
0
Telephone Number
01009804298
LinkedIn Profile
http://www.linkedin.com/profile/view?id=233985066&trk=tab_pro
Facebook Profile
http://www.facebook.com/ehab.ellatif