Oil / Gas / Power

Achbar Rahawarin

First Name
Achbar
Last Name
Rahawarin
Professional Since
Oldest experience
Years Experience
2
Telephone Number
+6281331026280
LinkedIn Profile
http://id.linkedin.com/pub/achbar-rahawarin/28/887/3a/

Project Planning, Primavera P6, Microsoft Project

Construction/Structural Engineer, McDermott Indonesia, Esso KTTGP

START Date
END Date

 

  • Responsible to prepare design analysis, calculations, drawings, and procedure for all operation in Construction Phase such as lifting, transport, Roll-Up, until Load Out the structure
  • Analyzed and maintained the structural integrity during operation.
  • Provided support for Fabrication Team to get safe and easy operation

Project Planning Engineer, Norshore AS, Norshore Atlantic Project

START Date
  • Responsible to review, control and monitor the updated Schedule given by the Contractor and compare to the Baseline Schedule
  • Responsible to analyze the progress trend and perform forecast analysis of the updated schedule
  • Communicate with the Contractor for any negative trends that will lead the project to delay and propose actions to tackle it.
  • Review Weekly Project Report given by Contractor
  • Responsible to create, contro

Baburaj T M

B
Baburaj T M 👤 Member for 13 years 3 months
First Name
Baburaj
Last Name
T M
Professional Since
Years Experience
0

 

EDUCATIONAL QUALIFICATIONS: Diploma In Project Management using Microsoft Project 2007-2010 B E in Mechanical Engineering-2004-2008 Vocational Higher Secondary(Maintenance& Repairs of Automobiles) -2004 Secondary School Examination(Technical Higher Secondary)-2002COMPUTER PROFICIENCY Microsoft Project 2007 Microsoft Office (Excel, Word, PowerPoint) Basic Knowledge in Primavera 6 Basic Knowledge in AutoCAD

Ben Janes

B
Ben Janes 👤 Member for 17 years 6 months
First Name
Ben
Last Name
Janes
Professional Since
Oldest experience
Years Experience
4

Primavera P6

Resource Forecasting

Progress Reporting

Risk Analysis

Interface Management

Planner/ Scheduler, Turner and Townsend, BP Oil Refinery Turnarounds

B
Ben Janes 👤 Member for 17 years 6 months
START Date

Seconded into the BP Bulwer Island Oil Refinery in Brisbane, Australia Turnaround team.

I play a key role in the planning/ scheduling for major Oil refinery shutdown events where the schedule is an important tool in ensuring the huge workscope can be carried out in the time frame allowed. Workfront interfaces, resource requirements and exclusion zones through heavy lifts, unit start-ups etc all form part of the planning process. There are up to 700 men working on the turnaround during execution.

Civil Engineer, Galfar Engg and Construction SAOG, Yibal Expansion Green Field, Crude Oil Gathering Station , Oman

START Date
END Date

Duties & Responsibilities

  • Civil Execution works: for Gathering Station Yibal Expansion Green Field Project Yibal, and various Civil Construction works for Engineering Service Contract, Fahud, Oman (Following PTW system of Petroleum Development Oman)
  • Planning works: (as and when required)
    Scheduling and Monitoring for various Jobs at Fahud Oil fields. Prepare daily, weekly, monthly look-ahead programs, daily plant allocation, purchase order status report etc. Receive, accept and ensure distribution and control of Purchase Orders.

Senior Planning Engineer, Leighton Contractors Pty Ltd, Gorgon LNG Civils & U/G Services, Barrow Island, WA

START Date
END Date

Duties & Responsibilities

  • Assist Area Manager/Project Engineer in development of Level 4/5 detailed construction Schedule.
  • Monitor Level 4/5 Schedule implementation and generate out-of-sequence activity report.
  • Directly responsible to the Planning & Controls Manager in maintaining the Primavera P6 Construction Schedule on site.
  • Monitor, analyse and review program performance outcomes for area of responsibility and recommend corrective action where necessary.
  • Gather construction progress data inputs and reports from Area M

Senior Planning Engineer, DTMT Construction, Newman, Western Australia, Yarnima Power Station project

START Date
END Date
Experience Hours (Planning & Scheduling)
3150
Experience Hours (Forensic Analysis)
400

PROJECT:  Civil & NGI works of the Construction of 190 MW Combined Cycle Gas Turbine (CCGT) Yarnima Power Station in Newman-

1.    Civil and U/G Services for Yarnima Power Station Project, Newman.

Sara Salvesen

First Name
Sara
Last Name
Salvesen
Professional Since
Years Experience
0
LinkedIn Profile
www.linkedin.com/in/sarasalvesenpmp

Accomplished project controls, LNG change management and portfolio/project management professional with over eighteen years of experience in EPC and p