Construction Project Planner / Senior Planner, ORIGIN, LNG
Senior Planner of 3 projects includes Enginnering, Procurement, Fabrication, Construction and Precommitioning
Construction Project Planner / Senior Planner, ORIGIN, LNG
Senior Planner of 3 projects includes Enginnering, Procurement, Fabrication, Construction and Precommitioning
Tyler Babin
- Develop detailed resource and cost loaded schedules
- Conduct schedule development meetings to determine path of construction and assignment of leveling priorities
- Running what if scenarios to maximize the schedule and avoid possible delays
- Update and maintain the turnaround schedules while in shutdown
- Prepare progress reporting documents for all contractors.
- Interface with all contractors to deliver schedule updates in daily turnover meetings
- Report schedule progress and performance to upper management
- Perform Critical
Planner / Scheduler, Turner Industries Group, L.L.C., Multiple clients
P6 DBA / Currently I am setting up P6 for project management within our organization
Assistant Manager Project Planning, Olympia Chemicals Limited, Expansion of Soda Ash Plant
· Preparation of baseline program master schedule base on project requirements and perform critical path analysis.
· Analyze the work statements and drawings for preparation of level IV activity networks in order to calculate the require resource for smooth execution of project;
Muhammad Azeem
Working with Descon Engineering Qatar as Planning Engineer from November 2011 to date.
Planning Engineer, DESCON Engineering Qatar L.L.C, PMP
· Preparation of baseline program master schedule base on project requirements and perform critical path analysis;
· Analyze the work statements and drawings for preparation of level IV activity networks in order to calculate the require resource for smooth execution of project;
Planning Engineer, Olympia Chemicals Limited, Erection of CFBC Boiler
· Responsible for preparing all documents relating progress measurement and monitoring.
· Analyze drawings, specifications and SOW for preparation of activity networks for project planning and scheduling.
· Preparation and implementation of three month and four week look ahead plan
Jeffery Robain