Oil / Gas / Power

Ellie G

E
Ellie G 👤 Member for 13 years 4 months
First Name
Ellie
Last Name
G
Professional Since
Oldest experience
Years Experience
0

Tyler Babin

First Name
Tyler
Last Name
Babin
Professional Since
Oldest experience
Years Experience
7
Guild Accreditation
GPC Member
  • Develop detailed resource and cost loaded schedules
  • Conduct schedule development meetings to determine path of construction and assignment of leveling priorities
  • Running what if scenarios to maximize the schedule and avoid possible delays 
  • Update and maintain the turnaround schedules while in shutdown
  • Prepare progress reporting documents for all contractors. 
  • Interface with all contractors to deliver schedule updates in daily turnover meetings
  • Report schedule progress and performance to upper management
  • Perform Critical

Assistant Manager Project Planning, Olympia Chemicals Limited, Expansion of Soda Ash Plant

START Date

·         Preparation of baseline program master schedule base on project requirements and perform critical path analysis.

·         Analyze the work statements and drawings for preparation of level IV activity networks in order to calculate the require resource for smooth execution of project;

Muhammad Azeem

First Name
Muhammad
Last Name
Azeem
Professional Since
Oldest experience
Years Experience
5
Telephone Number
+97433814231

 

Working with Descon Engineering Qatar as Planning Engineer from November 2011 to date.

Planning Engineer, DESCON Engineering Qatar L.L.C, PMP

START Date
END Date

·         Preparation of baseline program master schedule base on project requirements and perform critical path analysis;

·         Analyze the work statements and drawings for preparation of level IV activity networks in order to calculate the require resource for smooth execution of project;

Planning Engineer, Olympia Chemicals Limited, Erection of CFBC Boiler

START Date
END Date

·         Responsible for preparing all documents relating progress measurement and monitoring.

·         Analyze drawings, specifications and SOW for preparation of activity networks for project planning and scheduling.

·         Preparation and implementation of three month and four week look ahead plan