Oil / Gas / Power

Planner, ESP Asia Pvt.Ltd,Gaytech Engg.Pvt.Ltd.,CODE Engineers Pvt.Ltd, Natural gas compressor Station,Petroleum refinery construction and shut down

START Date

Professional Experience(Current)     -  Mar‘2013 – May’2013

Position:                                               -  Planning Engineer

Planner, ESP Asia Pvt.Ltd,Gaytech Engg.Pvt.Ltd.,CODE Engineers Pvt.Ltd, Natural gas compressor Station,Petroleum refinery construction and shut down

START Date

Professional Experience(Current)     -  Mar‘2013 – May’2013

Position:                                               -  Planning Engineer

Planner, ESP Asia Pvt.Ltd,Gaytech Engg.Pvt.Ltd.,CODE Engineers Pvt.Ltd, Natural gas compressor Station,Petroleum refinery construction and shut down

START Date

Professional Experience(Current)     -  Mar‘2013 – May’2013

Position:                                               -  Planning Engineer

Planner, ESP Asia Pvt.Ltd,Gaytech Engg.Pvt.Ltd.,CODE Engineers Pvt.Ltd, Natural gas compressor Station,Petroleum refinery construction and shut down

START Date

Professional Experience(Current)     -  Mar‘2013 – May’2013

Position:                                               -  Planning Engineer

Planner, ESP Asia Pvt.Ltd,Gaytech Engg.Pvt.Ltd.,CODE Engineers Pvt.Ltd, Natural gas compressor Station,Petroleum refinery construction and shut down

START Date

Professional Experience(Current)     -  Mar‘2013 – May’2013

Position:                                               -  Planning Engineer

EPC Lead Planner, "Tekfen Construction and Installation Co., Inc.", Galkhynys Gas Development Project Turkmenistan

START Date
END Date

Lead Planner, South Yoloten, Turkmenistan, Jun 2012 - Feb 2013

Client: Turkmengas, EPC Contractor: Petrofac

  • As the Lead Planner of Natural Gas Development Project, I oversaw the actions of schedulers and cost engineers, and anticipated the necessary changes to keep the project on schedule and within the budget
  • Led the team for preparation of baseline schedules, S-Curves, manpower histograms, schedule updates, progress measurement system, and key performance indicators (KPIs), daily, weekly and monthly reports 

Project Controls Lead, "Tekfen Construction and Installation Co., Inc.", PO Plant, Sadara Project

START Date
END Date

Project Controls Lead, Saudi Arabia, Feb 2013 - Sep 2013

Client: Sadara, EPC Contractor: Foster Wheeler

As the Project Controls Lead of Propylene Oxide plant of the Sadara Project, I managed the Project Controls Team in the following areas: