SENIOR PLANNING ENGINEER , TECNICAS RENUDIDAS, KBR, JGC, LNG Seagas Damietta (Egypt), joint venture of KBR (Kellogg, Brwon & root)-TRSA (Tecnicas Reunidas)-JGC (Japan Gas Company)

L
LUIS PEREZ 👤 Member for 14 years 5 months
START Date
END Date

EPC planning of the LNG Sea Gas Project Plant of Damietta (Egypt), joint venture of KBR (Kellogg, Brwon & root)-TRSA (Tecnicas Reunidas)-JGC (Japan Gas Company) with an investment budget of 1,2 billion USD under the TKLSP contract terms.

The project specification required the development of design, procurement and contruction phases of a LNG plant, four LNG ship carriers of 150.000 TPM each to be be built in Korea, and two LNG tanks of 150.000 M3 as the LNG storage system.

This EPCC project was a managing joint venture composed by three engineering companies, KBR-

PRINCIPAL PLANNING ENGINEER , SENER INGENIERIA Y SISTEMAS, Tres Cantos (Madrid), Spain, BP Oil New Port Facilities of Castellón (Spain), LNG Dunkerque EPC, Underground Railway of Panama,LRT/Tram Project of Light Rail Train/Tramway of Abu Dhabi (UAE)

L
LUIS PEREZ 👤 Member for 14 years 5 months
START Date
END Date

BP Oil New Port Facilities of Castellón (Spain)- Refinery Revamping, Interconnecting Works and New Port Facilities for maritime loading & unloading HC products. Project asset budget of 50 Million Euros.

LNG Dunkerque EPC project of Regasification plant of Dunkerque (France)for EDF (Electricité de France). Investment Budget of 900 Million Euros.

Underground Railway of Panama- Detail Engineering & Auxiliary Systems of the underground railway.

Principal Planning Engineer, SENER INGENIERIA Y SISTEMAS, Spain, Tres Cantos (Madrid), BP Oil New Port Facilities of Castellón (Spain), LNG Dunkerque EPC, LRT/Tram Project of Light Rail Train/Tramway of Abu Dhabi (UAE), Underground Railway of Panama

L
LUIS PEREZ 👤 Member for 14 years 5 months
START Date
END Date

BP Oil New Port Facilities of Castellón (Spain)- Refinery Revamping, Interconnecting Works and New Port Facilities for maritime loading & unloading HC products. Project asset budget of 50 Million Euros.

LNG Dunkerque EPC project of Regasification plant of Dunkerque (France)for EDF (Electricité de France). Investment Budget of 900 Million Euros.

Underground Railway of Panama- Detail Engineering & Auxiliary Systems of the underground railway.

OFFSHORE PLANNING MANAGER , SAIPEM (SOFRESID), EP Anguille Offshore Platforms Revamping, Pau (France). TOTAL oil fields of Anguille & Torpille at Gabon

L
LUIS PEREZ 👤 Member for 14 years 5 months
START Date
END Date

Offshore Planning Manager responsible of EP Schedule and Project Controls Managing of EP Anguille Offshore Project of for the EP revamping of 15 Oil & Gas Marine platforms of TOTAL for the marine oil fields of Anguille & Torpille at Gabon.

I collaborated in the development and starting-up of a program network of 5.000 activities in P6 Oracle software that will be the planning basis for the timing, following up, and progress control of the detail engineering and procurement phases.

PROJECT CONTROLS MANAGER , INTECSA (ACS Group), Madrid (Spain), Flare Gas Recovery Revamping TAKREER, International tender proposals, MBAC Refinery & Bauxite Mine

L
LUIS PEREZ 👤 Member for 14 years 5 months
START Date
END Date

Project Controls Manager of the Lump Sum Projects for the Flare Gas Recovery Revamping of  TAKREER (Abu Dhabi Oil Refinery Company) on both of Ruwais & Abu Dhabi Refineries with a budget around of 40 million USD.

PLANNING LEAD CONSULTANT , GAZ DE FRANCE SUEZ, TOUATGAZ (JV of Gaz de France Suez & Sonatrach in Algeria)

L
LUIS PEREZ 👤 Member for 14 years 5 months
START Date

Planning & scheduling Lead Consultant of major engineering schemes through design, procurement and construction programmes (including commissioning) for the 3 large EPCC Projects of the JV of TOUATGAZ (Gaz de France Suez & Sonatrach) in Algeria (expected investment around 2 billion USD).

 

  • Preparation of overall Project Master Schedules (Level 1 and Level 2) to support a global perspective for General and Project Management of Gaz de France Suez and Sonatrach.
  • Definition of critical path and set-up of progress measurement system and sched

Planning & Project Control Manager, Dragon Offshore Industries LLC, Offshore Rigs, Oil Rig / Jacket / Oil field Platforms

START Date

Experience Summary:

14 years in planning of civil & electro mechanical works as Planning engineer.
2 ½ years in design and detailing of steel structure works as Design engineer.
2 ½ years in tendering and cost analysis of various civil works as Contracts engineer.
4 ½ years execution of civil works as Project engineer / Site engineer.

Details of Professional Experience:

I) From April 2006:
Working with M/s.

Planning & Project Control Manager, Dragon Offshore Industries LLC, Offshore Rigs, Oil Rig / Jacket / Oil field Platforms

START Date

Experience Summary:

11 years in planning of civil & electro mechanical works as Planning engineer.
2 ½ years in design and detailing of steel structure works as Design engineer.
2 ½ years in tendering and cost analysis of various civil works as Contracts engineer.
4 ½ years execution of civil works as Project engineer / Site engineer.

Details of Professional Experience:

I) From April 2006:
Working with M/s.

Planning & Project Control Manager, Dragon Offshore Industries LLC, Offshore Rigs, Oil Rig / Jacket / Oil field Platforms

START Date

Preparation of Contractual Program of Works under multi project environment..

Manpower / Equipment Projections.

Preparation of Project Control System under various disciplines.

Preparation of Weekly / Monthly Progress Reports.

Preparation of look-ahead schedules / turn around schedules.