Oil / Gas / Power

Planning Manager, MITSUBISHI HEAVY INDUSTRIES PLANT CONSTRUCTION COMPANY LIMITED, Ar Razi Saudi Methonal Shut down project

START Date
END Date

 EXPERIENCE

 

 

Apr13 – Present      SBA TECH Tamilnadu

                                   Manager (Construction /Planning)

 

Project control specialist, Fluor Arabia Limited, MA’ADEN ALUMINIUM COMPLEX PROJECT

START Date

The USD 10.8Billion Ma’aden Aluminum Project (Joint venture between Alcoa & Ma’aden) consists of Alumina Refinery, Bauxite Mines, Rolling Mill, Smelter, Carbon, Reduction, Tankage, Calciner and Sea port area, 12KM of 40” Oil transporting pipeline, Power Substations, Water treatment, Security and Communication Systems, Buildings and development of Integrated Infrastructure for all Utilities.

Project Control Engineer, Attila Dogan & Seeh Al Saryya LLC, OFF-PLOT DELIVERY CONTRACT (ODC-PDO)

START Date
END Date

Installation of new flow lines (water injector, oil & gas), Construction of well pads / cellars for new rigs, Location preparation / modification works for hoists, Construction of access roads and right of ways, Construction of Control Buildings, Mechanical, Electrical & Instrumentation works during Hookup and miscellaneous integrity jobs for oil & gas products.

Planning & Cost Control Engineer, Gulf Consolidated Contractors Limited, PIPELINE & OFF PLOT FACILITIES AT JUBAIL EXPORT REFINERY (PKG-8)

START Date
END Date

Installation of Shipper Pumps, Installation of Surge Relief Skids, Detergent Injection Skids, Split tees, Control Valves, Flow lines and cross country pipelines at different sections. Construction of VFD Building for shipper pumps. Construct Pipe Sleepers, above ground Pipe Supports and miscellaneous foundations.