Lead Planner, Akersolutions, MURPHY MEDUSA
- Prepared a Level 6 EPC Schedule for the entire scope using P6 version 8.2
- Assisted Engineering in Preparation of the MDL and loading of planned dates into SAP
- Created WBS In SAP
- Created Networks and Activities in SAP to mirror the entire scope
- Carried out Critical Path analysis on Project Schedule to ensure deliveries are on schedule
- Carried out Weekly update of the schedule which is submitted to the client Responsible for planning all systems and manufacturing activities; interface directly with Stakeholders i.e.