specialist with product information, Aker , Drilling product
Project management. Computer science backbround. Experience in Oil & Gas field.
Project management. Computer science backbround. Experience in Oil & Gas field.
Project management. Computer science backbround. Experience in Oil & Gas field.
PROJECT: SGR- Seasonal Gap Reduction project is to reduce the Crude Oil production Gap between Winter & Summer, by providing appropriate Cooling system.
MY WORK: Involved working with the Client, Lead a team of Planners for the FEED & Construction.
Major Duties & Responsibilities: [using Primavera ver. 8.3.1]
I can work in Primavera Version 3 & 6. Advance knowledge in Excel, Microsoft Word, Power Point. I can also work as Estimator.
Senior Planning Engineer Sea Lion Project.Full offshore field development, currently entering FEED phase of project. Proposed Tension Leg Platform (TLP) with Topsides dry weight of 21,000 tonnes, subsurface development design accommodating reservoir characteristics. As the Senior Planning Engineer for Premier Oil I am responsible for measurement and collation of the entire Field Development Plan together with schedules and estimates relating to future Hook-up, Commissioning and Maintenance of the facilities.
Senior Planning Engineer GDF Cygnus Development Project, four topside modules with a combined tonnage totalling 13,200, Alpha complex comprises of three bridge
Senior Planning Engineer YME Offshore Re-Development Project, Mopustor (Mobile Offshore Production Unit with Storage) facilities comprise of 13,500 tonne topside unit (nominal production 60,000 BOPD) supported on 3 jacking legs, inboard accommodation for 77 production/ maintenance operatives all construction compliant to Norwegian (DNV) specifications. Resident at the Rosenberg Construction yard responsible for development and monitoring of Construction Phase through to Offshore HUC.
Senior Planning Engineer Leman Uptime Power Generation Project, largest Brownfield Modification scope of work in the history of the Southern North Sea – Client SHELL. Change out of antiquated/damaged Ruston Generators for three new Pon Power (Caterpillar) Gas Turbine Generators weighing 16.5 tonnes in total. Upgrade of Control and Safety System within the live platform Local Equipment Room. Responsible for the creation, management, manipulation of Level 4 Construction/Pre-Commissioning/Commissioning Plan consisting of 2500 activities.