Oil / Gas / Power

project planner, GLT NAM, Well expansion project

START Date
END Date

2013

GLT+

Project planner

Off January 2013, as a project planner on a 160 mln Euro, 600.000 hours wells expansion program for NAM- Groningen, The Netherlands. Responsible for all construction planning issues as part of the Project Management Team.

Tools: Primavera P6

Location: Sappemeer

Procurement by: XDES

project planner, TOTAL, SURF and TOPSIDES development program Northsea

START Date
END Date

2011-2012

TOTAL E&P Nederland bv

Project planner

December 2011 to December 2012 working with TOTAL E&P in The Netherlands, planning offshore SURF and Topsides developments programs.

Tools: Primavera P6, Value 160mln Euro.

Location: Den Haag NL

Procurement by ATLAS

project planner, Vopak, scheduling and monitoring/reporting revamps

START Date
END Date

2011

Vopak Terminal Europoort

Project planner

Supporting Projects Department with scheduling and monitoring/reporting revamps and renewals of systems.

Tools: Primavera 2011

P6, Value 30mln Euro.

Location: Rotterdam NL.

Procurement by Stevenparc B.V.

Planning & Project Control Engineer, Statoil ASA, Visund Nord Subsea Production System ; Visund Sør Subsea Production System ; •Stjerne Subsea Production System ; •Vilje Sør Subsea Production System ; •Svalin Subsea Production System ; •Johan Sverdrup FE

START Date
END Date
Experience Hours (Planning & Scheduling)
5000
Experience Hours (Cost Management)
6000
Experience Hours (Forensic Analysis)
5000

·    Responsible for all Project Control activities within the Contract, and ensure consistent and uniform performance according to governing documents, requirements and “Best Practice” within SDT Project Control.

·    Ensure that Contractors reporting, planning and progress are according to the Contract requirements. Make sure that Sub Contractor’s schedules are available and support Contractors overall baseline plan.

EPC Lead Planner, KBR (Energy & Chemicals Div), Barrow Island - Gorgon Project

START Date
END Date
Experience Hours (Planning & Scheduling)
200
Experience Hours (Cost Management)
100
Experience Hours (Forensic Analysis)
50

Assigned at Fabrication Yard, Primary role looking after the Fabrication of Train 1 and Train 2 area up to Pre-Commissioning.Supervised subcontractor COOEC Planners, helping them to develop their Level 5 schedules for Train 2 and Train 1.Review the Fabrication Master Schedule and helping to do the re-baseline especially the additional scope of work.

Senior Planning Engineer, KBR (Energy & Chemicals Div), Icththys LNG

START Date
END Date
Experience Hours (Planning & Scheduling)
200
Experience Hours (Cost Management)
100
Experience Hours (Forensic Analysis)
50

Assigned at Fabrication Yard, Primary role looking after the Fabrication of Train 1 and Train 2 area up to Pre-Commissioning.Supervised subcontractor COOEC Planners, helping them to develop their Level 5 schedules for Train 2 and Train 1.Review the Fabrication Master Schedule and helping to do the re-baseline especially the additional scope of work.

Rona Garrett

First Name
Rona
Last Name
Garrett
Professional Since
Years Experience
0
Telephone Number
661-292-0898
LinkedIn Profile
http://www.linkedin.com/pub/rona-garrett/56/5a7/508

I am a reputable business scheduler with more than six years of Project controls experience managing and stream lining project construction schedules, including the oversee of scheduling operations, encompassing multiple leases. Over the course of my career I have disciplined myself in organizing, scheduling and managing cost, resource loading schedules to bring about the successful completion of specific project goals and objectives.

Planning Manager, Joint Venture GeoSea - Hochtief, Baltic 2 – Offshore Wind farm Project. Design, Fabrication & Procurement, Installation of Foundations & Wind Turbine Generators

START Date
END Date

Planning Manager for Baltic 2 Offshore Wind Farm Project (Design, Fabrication & Procurement, Installation of Foundations & Wind Turbine Generators). 

Project Controls Lead, Talon Energy Services, CNRL Horizon

START Date
END Date

Level IV P6 schedule for tracking work. Set up reporting systems to client and implementing to the project team. Daly progress tracking using installed quantities and weighted values (EV) Reporttin EV and PF to management on a daily basis.

Create, validate and expedite change orders (COs) CSTS 2009 qualified. Daily use of Primavera  v 8.3.2