Oil / Gas / Power

Jithin Kambhikanam

First Name
Jithin
Last Name
Kambhikanam
Professional Since
Oldest experience
Years Experience
8
Telephone Number
00971556943685

My greatest experience is the ablity to learn from people i have met and learn new things fast. I was first MEP Planning Engineer for building,Villas and after that by luck i got into as Project Control Engineer in Oil and Gas which doesnt happen normally.I have Site experience in both the field which teached me Construction practices, productivity ratings.

Sr. Project Controls Specialist, CH2MHill, Low Density Fuel Line - Emergency Repair

START Date
END Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Cost Management)
1000

Provided project controls leadership and management support within project organizational structure. Implementation of project controls program imparting budget, cost and schedule integrity for 170 annual operations and maintenance projects equaling $70M. Developed processes, procedures, and rules of performance, coordinated project teams, and executed continuous improvement. Gathered, input, and reported cost and schedule assisting management in maintaining projects, contracts and agreements.

Senior Project Controls Lead, CH2MHill, Compressed Gas Facility - Lid Flip

START Date
END Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Cost Management)
1000

Established initial project budgets and prepared subsequent budget updates for all design and/or construction activities. Collaborated with Project Engineers, Project Managers, and clients to review preliminary cost estimate and select appropriate design alternative. Reviewed and prepared cost control/performance reports, forecasts and special studies. Prepared conceptual, preliminary and definitive estimates. Recommended adjustments to manpower requirements and rearranged work plans to optimize utilization of resources.

Assistant / Planning Engineer, "NBTC, Kuwait", LOW FARS HEAVY OIL DEVELOPMENT PROJECT PHASE I

START Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
500

Naser M. Al-Baddah & Partner

General Trading & Contracting Co. W.L.L.(NBTC) - Kuwait          Planning Engineer (Nov 2015 – Till Date)NBTC an ASME, ISO 9001 , 14001, and 18001 (OHSAS) certified organization engaged in Laying and Commissioning of Cross-Country Petroleum Product Pipelines, LSTK Plant Projects in Petroleum Industry, Industrial Civil Construction on EPC basis and conventional basis in Gulf Countries.    

 

Project Experience

Sarthak Sharma

First Name
Sarthak
Last Name
Sharma
Professional Since
Oldest experience
Years Experience
5

# Prepared system wise turn around schedules for construction, shutdown plans & micro schedules.

#  Prepare 3Week and 2Month Look ahead Plan & Schedules, Progress S-Curves.

# Periodically update and Control Schedule & Cost through Primavera P6 & Microsoft Project.

#  Prepare Daily, Weekly, Monthly Status Reports and customized planning reports (MIS) as required.

Assitant Planning Manager, Fernas Construction Co, DAHEJ GUJARAT

START Date
END Date
Experience Hours (Planning & Scheduling)
4000
Experience Hours (Cost Management)
1800
Experience Hours (Forensic Analysis)
100

Fernas Construction India Pvt. Ltd - India                                        Asst.  Manager (June 2013 – Nov 2015)

Assistant / Planning Engineer, Punj Lloyd Limited, DBPL PH-II

START Date
END Date
Experience Hours (Planning & Scheduling)
6000
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
50

Punj Lloyd Ltd – India                                                                              Engineer (Sep. 2010 – June 2013)

Engineer / Project Engineer, Subsea 7, Shell BC-10: BP Block 31; Exxon Mobil Saxi- Batuque

START Date
END Date
Experience Hours (Planning & Scheduling)
50
Experience Hours (Cost Management)
50
Experience Hours (Forensic Analysis)
0

Substantial experience as a project engineer, that entailed similat activities as a project planner. 

  • Developed, planned and produced load-out and installation procedures of project assets.
  •  Managed equipment fabrication and product acceptance tests.
  •  Presented HIRAs, HAZOPs, Shift handover meetings, team updates & safety briefings.
  •  Managed drafting team to produce technical drawings & sketches.
  • &nbsp

Engineer / Project Engineer, Subsea 7, Shell BC-10: BP Block 31; Exxon Mobil Saxi- Batuque

START Date
END Date
Experience Hours (Planning & Scheduling)
50
Experience Hours (Cost Management)
50
Experience Hours (Forensic Analysis)
0
  • Developed, planned and produced load-out and installation procedures of project assets.

•  Managed equipment fabrication and product acceptance tests.

•  Presented HIRAs, HAZOPs, Shift handover meetings, team updates & safety briefings.

•  Managed drafting team to produce technical drawings & sketches.