Oil / Gas / Power

Sr. Planning Engineer, Descon Engineering Abu Dhabi, ADGAS OFFSHORE (ADNOC) Turnaround

START Date
END Date

1. Planning to replace main Cryogenic Heat Exchanger

2   Create Notification, Material Identification and Material Order in SAP

3.  Reservation of material using SAP

4.  Preparation of detailed Level III and Level IV integrated shutdown / turnaround Execution Plan with resources & Prepare man-hours analysis

5.  Prepare Detail Package against each Work Request for execution.

6.  Responsible for the overall planning, development and monitoring of a project and maintain the project planning system and procedures.

FARRUKH HABIB KHAN

First Name
FARRUKH
Last Name
HABIB KHAN
Professional Since
Oldest experience
Years Experience
11
Telephone Number
00966-50-7909856
  • SAP 
  • CMSi  
  • Packager V.3 
  • Bentley Projectwise Explorer 2004 
  • Primavera Project Management (P 6). 
  • Primavera Project Planner (P 3) 
  • Maximo 4.0.1 
  • MS Office 2007 (Word, Excel)

Steve Dopps

S
Steve Dopps 👤 Member for 9 years 9 months
First Name
Steve
Last Name
Dopps
Professional Since
Oldest experience
Years Experience
12

Major focus areas include CPM scheduling, forecasting, change management, delay analysis, cost control, and overall project management within the semiconductor, transportation, manufacturing, & oil/gas industries for the last 15 years. Experienced in preparing & reviewing schedules, performance metrics, critical path development/maintenance, resource planning, & baseline control.

Construction Project Planner / Senior Planner, WorleyParsons, Potash Expansion Project

S
Steve Dopps 👤 Member for 9 years 9 months
START Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
2000

Responsible for development, integration, & reporting of the Canpotex White Potash Expansion Project Master Schedule & Monthly Financial Report.  Responsibilities include progressing master schedule while providing 3 Week Look Ahead & Three-Month Look Ahead schedule for the Steering Committee Progress Meetings.  Also account for budget, cost, & forecasst changes in Prediction+, reconcile variances with the client, & produce/review payment certificates/invoices.

Idala Hanson

First Name
Idala
Last Name
Hanson
Professional Since
Years Experience
0
Telephone Number
+2347033014377
Facebook Profile
Idala Hanson

Currentlly working as Asst. Planning Engineer for OB3 pipeline project in Nigeria. A 48" 65km Gas pipeline contruction belonging to NNPC. One of the largest ever constructed in Nigeria.

Thomas Cream

First Name
Thomas
Last Name
Cream
Professional Since
Oldest experience
Years Experience
26
Guild Accreditation
GPC Member
GPC Pilot Tester
Telephone Number
07821703323
LinkedIn Profile
https://uk.linkedin.com/in/thomascream

I am an experienced Project Controls Manager with extensive experience in Planning, Cost Control, Risk Management, Contract Management, and cost estimation.  I have had the priviledge of working with some of the top companies, both clients as well as contractors.  This has enabled me to be equally comfortable performing planning for a FEED project, cost estimations and control for an EPC project, or risk analysis for a shut-down.

Site Cost Lead, Tecnicas Reunidas, LNG Seagas Damietta (Egypt)

START Date
END Date
Experience Hours (Planning & Scheduling)
0
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
0

I worked as the LSTK EPC contractor for construction of LNG Train in Damietta, Egypt.  Project was a JV of KBR, JGC, Tecnicas Reunidas, and M.W. Kellogg. This project was extremely schedule driven, and the challenge was to reduce project costs without impacting the overall progress.  I did this through rigorous change management, detailed cost control down to WBS+5 level, and a very indepth manpower plan to ensure the right mix of talent stayed on the project.

Subcontract Administrator, Tecnicas Reunidas, Home Office support

START Date
END Date
Experience Hours (Planning & Scheduling)
0
Experience Hours (Cost Management)
1000

Working in the home office, I provided cost control and subcontractor management support to the construction department of the home office.  During this period, in addition to cost control functions such as budget preparation and cost estimating, I also performed quantity surveying, preparing BoQ from measurements on site drawings to prepare applications for payments, Subcontractor management including drafting and award of subcontracts, and directly supervising several subcontracts for projects under execution.  Additionally, I reviewed and redacted technical requisitions to brin

Project Controls Manager, Tecnicas Reunidas, DHP and CCR

START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
600

Working as EPC contractor for an onshore brownfield revamping project that included a new Diesel Hydro Processing unit (DHP), Amine Regeneration Unit (ARU), Sulphur Recovery Unit (SRU), Sour Water Unit (SWU), and 2 new Cooling Towers- one chemical and one natural draft.  Additionally, an intense brownfield upgrade of the existing steam generation boilers, new turbo-generators, installation of new control room, and tie-in into existing operating plant.