Oil / Gas / Power

Project Controls Lead, Planning & Scheduling, CB&I London Engineering Office UK, TOTAL Uganda FEED

START Date

Front End Engineering Design to provide onshore facilities for the production, storage and export of heavy and waxy crude oil through a CPF, multiple Well Pads and associated flow line and pipeline systems. The plant will have a design life of 25 years for an oil plateau of 190,000 bpd.

Lead Planning Engineer, Shanahan Engineering Ltd, PP-12 Power Station, Riyadh, SA

START Date
END Date
Experience Hours (Planning & Scheduling)
1400
Experience Hours (Cost Management)
150
Experience Hours (Forensic Analysis)
300

I was Lead planning engineer for Shanahan Engineering working on the short term commissioning programme of block 2 of the 2.2gw CCGT PP-12 power station 140km west of Riyadh, total make up across the plant of 8 Gas Turbines, 8 HRSG’s & 2 Steam Turbine’s.

 

Ardiansyah Syahardian

First Name
Ardiansyah
Last Name
Syahardian
Professional Since
Oldest experience
Years Experience
9
Guild Accreditation
Awaiting Applicant
LinkedIn Profile
http://linkedin.com/in/ardiansyah-a-1b71b646

Experience at Project, Especialy Project Management, Project Design, Project Cost Estimating for 8 years at Oil and Gas Industry

Process Engineer, "Bechtel, Technip, Fluor Daniel, Tecnimont, Lurgi & Linde", Pertamina Jet A-1 Storage Facility

START Date
END Date

On Duty as Process Engineer : Design for Pump, Design For Pipe Checking, Design For Depressuring Sytem - FLARE, Simulation by Optimization using HYSYS

Syukri Yadi

First Name
Syukri
Last Name
Yadi
Professional Since
Oldest experience
Years Experience
9

Having proffesional career in Project planning since 2003 in several capital projects, Pulp & Paper, onshore, offshore and Deepwater Oil and Gas projects, Engineering consultant, Heavy steel fabrication, etc. 

Expert in using Project planning software, Primavera and Ms. Project and any other supporting software, database, Risk analysis, and Ms. Office. 

Contracts Senior Planning Engineer, Ara Worleyparsons, %26 Oil %26 Gas Projects

START Date
END Date

Planning engineer at worleyparsons indonesia for Conocophillips Engineering service Contract, Ruby Field Development on Mubadala, etc

Project engineer at Worleyparsons Indonesia for Senoro Gas Development, Total yadana Subsidence Project, etc