PLANNING & COST CONTROL ENGINEER - Sr., Southern California Edison, San Onofre Nuclear Generating Station
Business partner to Manager/Sr.
Process Improvement Specialist (Lean Six Sigma Black Belt), Pacific Gas & Electric Company, Organizational Change Management Projects
Position reported to a Director.
PEDRO ORTEGA
I am a professional highly organized with strong background scheduling EPC projects, solid understanding of project management principles (EVM, Total Slack, CPM, Critical Chain, Budget, etc.) Strong skills in Project Management software (MS Project, Primavera P6, Primavera Risk) and other tools and technics
Planning Engineer / Project Scheduler, Energy Solutions, Commissioning Services in Juan Manuel Valdez Power Plant
Management of Times and Resources for preservation, commissioning and commissioning works of the Juan Manuel Valdez Electric Power Plant
Project Planner (Construction) / Senior Project Planner (Design), INELMECA, Technical Proposal for 350M CFM Gas Treatment Plant
Scheduling and Project Management with Primavera P6 ver. 17.7. Collaboration for Technical Proposal and Budget for EPC Projects. Analysis of the scope, execution strategy, estimation of duration and sequence of activities.
Cost & Estiamting), Project Controls Lead (Planning, Fluor Pty, South African Refinery
Responsible for managing Project Controls Department. Project Control Lead for SAPREF (South African Refinery Joint Venture between Shell & BP. Fluor Contract with SAPREF is to provide Long Term Technical Services Agreement. Scope of work and Services is to provide Engineering Consultancy for all phase of FEL (BOD,BDP, BDEP, EPCm) services. Manage CAPEX/REVEX budget, from Conceptual Phase up to Construction Management from Pre-Shutdown and Shutdown execution. Manage Project Controls team in on site and interface with SAPREF counterpart on a daily basis.
Planning/Cost Engineer, AGAP Arabia Limited, Saudi Aramco, IPSA II (Iraq Pipeline Trans-Saudi Arabia, Phase II) On-Shore Marine Terminal for Company Oil Project (SCOP), Yanbu, Western Province, Saudi Arabia, Project contract
Construction of On-Shore Marine Terminal Unit in Yanbu this terminal recieved oil from Iraq to the in-land pipieline.
Work involved preparation of daily and three weeks look-ahead schedule, weekly key quantity forecast, weekly accomplishment / productivity report, monitoring and updating construction schedule. Preparation of labor cost forecast and assist in the preparation of Project Cost Report. Maintain orderly cost and schedule records to provide project history and records for ensuring the integrity of the project cost and schedule and historical data
Aristotle Ricardo
Over 25 years of progressive responsible experience in Conceptual, Pre-FEED, FEED (Front End Engineering & Design), EPC (Engineering Procurement and Construction), EPCm, Maintenance and Project Management Consultancy Services. 18 years experience in the management and control of large scale industrial projects in the Oil and Gas Industry.
Piping/Mechanical Engineer, AGAP Arabia Limited, Polystyrene Production Project
Construction of Petrokemya Polystyrene Plant Project, Assisted in the supervision of piping installation of plant utilities, plant sprinkler system. This includes pumps, skids mounted process equipment. Was also involved pre-commissioning activities hydrotest, airblowing, flushing and chemical cleaning . Preparation of test packages for testing. Assisted in the commissioning and start-up of Expandable Polystyrene Building Unit