Planner / Scheduler, Transocean, Various capital projects
800x600
800x600
Wood Group - Deepwater Specialists Inc October 2011 – April 2013
Pacific Drilling Santa Ana
Chevron Pipeline &
ENSCO International December 2013 – August 2015
BP Exploration (Epsilon) September 2015 - Present
claim & Anti-claim
As Control Manager on KC-13 Project which is 157 km.
SUMMARY OF EXPERIENCE
My most recent position. I was employed by FJ Booth Construction at a new Bio-Mass plant as a site manager, tasked with managing the installation of 127 tons of ducting of 4mm – 6mm rolled mild steel ducting with diameters ranging from 400mm to 2700mm. All welded connections using Bare wire positional MIG welding.
Duties included:
· Planning all the works using, Micro Soft Project Planner.
Hi my name is Lee Gibson. I've always worked in the construction industry (petro chemicle and oil and gas) as a Steel erector and Rigger. In 2006 I was diagnosed with Mutiple Sclerosis wich was ok until 2011 when my started to struggle with my mobility. At the time I was working offshore with a great bunch of guys who helped me with my struggles. I went into the planning of lifts and jobs, until 2016 when it became unsafe for me to work offshore with helicopters and the likes.
Primavera P6 Consultant, Project Controls & Planning Manager
Author at Project Schedule Pro - http://projectschedulepro.com