Construction Project Planner / Senior Planner / Forensic Analyst, MPP-FGD, Maritsa East 2 FGD Units 1-4

J
John West 👤 Member for 18 years 5 months
START Date
END Date

- Upkeep of Master Erection and Baseline Schedules

- Multiple Recovery/Acceleration Schedule Options

- Multiple Critical Path Analysis

- Performance Monitoring

- Progress Monitoring, including S-Curves

- Forensic Claims Analysis

- Delay Event Recording

- Contract Change Control

- Correspondence Archive Monitoring

- Additional and Re-work Scheduling

- Client and Sub-contractor correspondence review

Site Engineer, Electrowatt - Ekono, Incorporated (Philppines), Uong Bi 300MW Expansion, UPPC 133 ton/hr Coal Fired Boiler, NPI 2.4MW Diesel Plant Expansion, FRCC Power Plant Rehabilitation, MCI Exhaust Stack Reconfiguration

START Date
END Date
Experience Hours (Planning & Scheduling)
3700
Experience Hours (Cost Management)
3700

Responsibilities:

  • Responsible in management and administrative decision for project implementation, coordination, supervision and planning.
  • Prepared Bid Documents, Technical Specification and Tender Drawings. Managed project bidding, procurement and evaluation.
  • Assist in project design to attain optimum capacity at minimum cost.
  • Occupational Safety and Health Officer.

Project Involved:

Site Supervisor - Civil, Marubeni Corporation (Qatar), GTC/14/2003 Phase 5 - Cables

START Date
END Date
Experience Hours (Planning & Scheduling)
2400
Experience Hours (Forensic Analysis)
1000

Responsibilities:

  • Supervised and monitor site works of underground transmission cable installation (220kV, 132kV and 66kV) and attend inspection conducted by project consultant.
  • Prepare daily progress reports, work schedule, manpower schedule and site instruction.
  • Assist Engineering in design proposal to adopt site condition.
  • Assist Safety Manager for imposing project Safety Rules and Regulations.

Project Involved:

  • GTC/14/2003 Phase 5 – Cables (Qatar)



 

Planning (Scheduler) Engineer, Marubeni Corporation (Qatar), GTC/124/2006/C Phase 7, GTC/117/006 220kV & 66kV, GTC/14/2003 Phase 5

START Date
END Date
Experience Hours (Planning & Scheduling)
1800
Experience Hours (Forensic Analysis)
1800

Responsibilities:

Planning (Scheduler) Manager, Marubeni Corporation (Qatar), Substations and EHV Cables

START Date
END Date
Experience Hours (Planning & Scheduling)
5450
Experience Hours (Cost Management)
5450
Experience Hours (Forensic Analysis)
5450

Responsibilities:

  • Managed preparation of Tender Schedule including material delivery analysis for supply of cables and accessories.
  • Managed preparation of Project Cashflow, Budget Cashflow and quantity take off.
  • Managed preparation of schedule analysis of supplier’s delivery commitments and revised proposal to meet project completion date.
  • Managed monitoring and preparation of weekly progress reports, monthly progress reports and management meeting reports.

Project Involved: