Shutdown/Project Scheduler, Shell Refining Co. Fom. Bhd, 2010 Inplot Mini Shutdown, 2011 Major Turnaround, 2011 MAB Pit Stop Shutdown

START Date

Current Role:

  • - Responsible in Planning/Schedule Development stage for Shutdown/Turnaround
  • - Develop Integrated Execution Schedule – Structure
  • - Develop Code Structure in P3E as per system - Systemisation Structure
  • - Data entry / import of detail job plans and estimates into scheduling tool.
  • - Create logical network of activities and, ultimately, a critical path of work and schedule, without overly constraining the schedule.
  • - Updates schedule as required – typically daily or shiftly - based on planner reporte

Project Planning Lead, AMEC Nuclear Limited, D3900

A
Andrew Raw 👤 Member for 18 years 11 months
START Date
END Date

7 years in the Nuclear Industry. Recently transferred to a staff position to support the project manager on a key project for UKAEA. Experience and achievements include setting up work breakdown structures, establishing detailed resource/cost loaded level 3 programmes, planning and monitoring of project progress, risk planning and mitigation. Prior experience in a design capacity producing front-end design schemes through to delivery of hand over certification.