Oil / Gas / Power

Vepica Senior Planner

Senior Mech. Eng. Planner and Scheduler (Civil, Mech. and Elect. & Instr.) widely exposed on EPC Project Planning & Control on every phase of Oil Industry Projects from Conceptual through Engineering, Construction, Mechanical Completion, Pre & Commissioning and Start Up, on jobs related to Shutdown, Debottlenecking, Revamping and Major Maintenance projects dealing with Production and / or Refining Activities, Production, Refining, Shutdown, Expansions & Maintenance related Projects. Software planning proficient with a proven background in project / program planning.

Fletcher Construction Company Ltd Senior Planner

Te Mihi Geothemal Power Station - Develop the EPC programme for Fletcher Construction during the Tender stage for the 160MW geothermal power station to be built at Te Mihi, Taupo. The schedule covered engineering through to commissioning and addressed details of constructability to ensure the timely delivery. Programme developed using Primavera P6.(Project deferred due to economic climate.)

Kvaerner PLC Senior Planner

Marsden Point Refinery Debottlenecking - Plan the fabrication, installation, shutdown and commissioning of the debottlenecking project. The project involved installation of new cracker units and pipework in an existing plant with a major shutdown to tie in and transfer everything across to integrate the new equipment.