Te Mihi Geothemal Power Station - Develop the EPC programme for Fletcher Construction during the Tender stage for the 160MW geothermal power station to be built at Te Mihi, Taupo. The schedule covered engineering through to commissioning and addressed details of constructability to ensure the timely delivery. Programme developed using Primavera P6.(Project deferred due to economic climate.)