  • Develop EPC Baseline Schedule for LNG Terminal Project which includes Process, LNG Tanks, Jetty & Marine, Utilities, Buildings, Shelters and Others (Project #1). Prepare WBS weight values, loading of man-hours and generate plan S-Curves. 
  • Develop EPC Baseline Schedule for Phase 2 Project – Third LNG Tank (Project #2).

Foster Wheeler Senior Planner

Woodside

Pluto LNG

Laem Chabang, Thailand (TOC (Thailand Operating Centre))

Senior Planning Engineer

With Worley Parsons a joint venture (FWW)

Australian $12 billion LNG Project the fastest developed LNG project from discovery of gas field in 2005 to first gas in late 2010.

Onshore infrastructure comprises a single LNG processing train with a forecast production capacity of 4.3 million tonnes a year. The LNG train is being fabricated in Thailand and shipped to site in 264 modules and supporting structures, including four 930 tonne Gas Turbine Generators.