Various Planner
Current Role
Current Role
• Performed Project Controls of multidisciplinary Oil & Gas, Infrastructures, Petrochemicals, refinery & power generation projects.
• Analyzed major capital projects to plan the effective execution sequence based on current industry practices
• Performed project controls / cost control including change management & earned value analysis.
• Worked with project management team in several Petro chemical Pipelines and Refinery projects.
Adopt in preparing Master schedule incorporated with Manpower & Equipment requirement.
Co-ordination with Clients regarding the schedule, progress requirements, achievements & other requirement.
Co-ordination with all discipline Planners, Superintendents and Managers regarding the schedule & progress.
Co-ordination with other contractors in respect of the work fronts availability, schedules & requirement.
Preparation of Weekly reports & Monthly reports for Internal & External Management.
Preparation of Two weeks & Three Months L
Responsibilities:
Accountable for Planning related submittals & reports for Client and Top management.
Preparing Job packs and work matrix(Includes P3 Schedule, Lifting Plan, Ventilation Plan, Rescue Plan, JSA/TRA, Material Take off etc.) for Turnaround.
Co-ordination with Client and other contractors for Turn around as per the schedule.
Revamping and newly construction experience for ICT&T (Mech-II), Singapore Parallel Train Project (SPT)-second integrated petrochemical complex centred on a heavy steam cracker.
Project scope: Construction of piping & equipments ( pumps,trubines,compressors, towers & vessels, heat exchangers),Design & construction of steel work.
1) Report to planning manager and assist in the development of detail schedule, scope identification and logical sequences.
Engineering, Procurement and Construction Management of LRCCU plant modification and extension project, including:
-Piping Modification
-Heat exchanger, column, vessel, Tankage, reactor and regenerator , air fin cooler, separating equipment ,pump, compressor and blower equipment modification and new installation
-CO Boiler revamp and restoration included tube banks, Superheater, Ecomoniser, Soot blowers, Deslaggers, FD Blower, CO ducts) feed water drum, de-superheater, economizers)
1) Set up Work Break Down Structure for progress measurement and scheduling.
As a Mechanical Maintenance Engineer/Planner
1) Responsible for planning work packages for valves, piping, pipe supports, pumps, compressors, exchanger, drums, column, air fin cooler, reactor, tanks, inspections, welding etc. These plans included but are not limited to procedure selection, material identification and craft directions.
Current Role