Mining Works
Project Planner and Controller, Sasol Technology, Raw Gas Transfer Line (RGTL) Project, Electrostatic Precipator Internal Replacement, Second life cycle replacement of corroded fire water network
START Date
END Date
Sasol Technology
Project Planner and Controller
o Raw Gas Transfer Line (RGTL) Project;
o Electrostatic Precipator Internal Replacement;
Projects Control Engineer, ALACER GOLD COOPERATION, ÇÖPLER GOLD MINE PROJECT
START Date
END Date
I may forward detailed CV including detailed information regarding to my skills.
Claude Catudal
First Name
Claude
Last Name
Catudal
Professional Since
Years Experience
0
Ali Hamouda
First Name
Ali
Last Name
Hamouda
Professional Since
Oldest experience
Years Experience
10
Telephone Number
001-416-839-4933
SUMMARY OF QUALIFICATIONS
- 20 years Senior Planner, out of 25 years of engineering experience
- Earned Value Analysis (ETC, BCWP, ACWP)
- Planned and scheduled projects of TSD (Transportation Automation System Division) of Alcatel Ca.
- Planned oil tank, flow line and building construction projects
- Highly skilled in project scooping, managing, prioritizing and detailing schedules using Primavera Ver.6.2 , MS Project, and SAP PS System Module JD-Edward
Project control analyst, Imperial Oil, MLMR
START Date
SUMMARY OF QUALIFICATIONS
- 20 years Senior Planner, out of 25 years of engineering experience
- Earned Value Analysis (ETC, BCWP, ACWP)
- Planned and scheduled projects of TSD (Transportation Automation System Division) of Alcatel Ca.
- Planned oil tank, flow line and building construction projects
- Highly skilled in project scooping, managing, prioritizing and detailing schedules using Primavera Ver.7 , MS Project, and SAP PS System Module JD-Edward
Scheduler, Team Engineering, Conveyor Works
START Date
END Date
I'm very new to P6, I've only been using it for around 4 months. I've had around 16 months experience as a Project Engineer.
Pagination
- Previous page
- Page 73
- Next page