Mining Works
Tailing Engineer, Doe Run Perú S.R.L., Chacapampa Tailing Storage Facility
Tailing Engineer at Doe Run Peru, Cobriza Division, Project: Chacapampa Tailing Storage Facility
Contract administration, project control and supervision of construction works.
Dennis Rodriguez
Estimator / Quantity Surveyor, McElligotts Qld, Various Coal Mining Projects
JOB DESCRIPTION & RESPONSIBILITIES AS ESTIMATOR
• Reviews bid documents and prepares queries regarding technical matters.
• Verify completeness of tender documents, corresponds through IFPs and make sure complete information is available to prepare a tender response.
• Attends pre-bid meetings on technical and commercial matters.
• Coordinates with the document controller group for the distribution of any documents from the client during the tender period.
• Conducts site visits/surveys.
• Prepares basic engineering design if needed as the basis of tender proposal.
• Performs materia
Senior / Lead Planner, Bechtel Canada, Kitimat Modernization Project
Kitimat Modernization Project400.000Tons/year Aluminum Smelter on Kitimat, BC for Rio Tinto Alcan.
Senior Plannerfor Pre-Feasibility & FEED studies, Early Works (Cleaning&Demolition, BrownField works, prep works) and Construction Works
Senior Consultant Project Controls, Minenco Pty Limited, Many Mining Projects
Minenco is a wholly owned by CRA, its core activities are the evaluation, design and construction of resource based projects from the initial study to the hand over of a completed project to the client. Developing an Underground Mining Database and mining estimates for a number of projects including Century and Dugald River lead-silver-zinc mines in Queensland, upgrade work for Kaltim Prima Coal and Kelian Gold, order of magnitude estimates for a number of capital and operating studies including Gag Island open cut mine and port, Tight Oil open cut/dredging oper
Jacques Smith
Chris Jenkins
Henk Claasen
Role: Project and workshop planner
- Steel upgrade and corrosion protection for Kumba iron ore mine plants and conveyors.
- Project planner and Quality controller on E-Feed Capacity tank, structures and pipelines fabrication and installation project
- Project planner on WACS Dewatering bin, structures and piping project
Senior Planner, Mott MacDonald, Simandou Iron Ore Mines and infrastructure
Project Description:
Multi-billion dollar project to build two new iron ore mines in Guinea, plus associated rail and port infrastructure.
Roles and Responsibilities:
Senior Planner within a 5-strong team acting on behalf of the client during the tender phase. My main focus of work was on the rail element of works (approx 670km single track, including approx 30km of tunnels)
Responsibilities include:
Prepare ITT documentation
Assess Tender returns