4D Planning Consultant, Volka, Building Works (Villas)

START Date
END Date

Responsible for preparation of Clause 14 Baseline Program for project at the tendering stage as per the scope of

work in Primavera version P3.1 & P6.

 Developed the (MTS) level 4 integrated EPC (Engineering, Procurement and Construction) schedule based on

contract requirements in cooperation with the Managing Contractor on Primavera.

 Updated and reviewed the BSC (Balanced Score Card) for projects. Conducted several presentations for the

site team in order to highlight the importance of BSC.

planner, Volka, Building Projects

START Date
END Date

Responsible for the planning and control for the execution of a brown field development, including a field integrity upgrade and field capacity extension on an existing oil field in Oman. During the execution phase of involved in all project management related functions, including estimating, planning and scheduling, risk analysis, cost forecasting and economic appraisal.

Kevin Ling

K
Kevin Ling 👤 Member for 15 years 1 month
First Name
Kevin
Last Name
Ling
Professional Since
Oldest experience
Years Experience
43
LinkedIn Profile
pub/kevin-ling/61/b16/15b/

Deputy Construction Manager, Cheung Kong (Holdings) Limited, High Rise Residential Developments

K
Kevin Ling 👤 Member for 15 years 1 month
START Date
  • Review Draft Contracts, Drawings and Specifications for New Works Tenders
  • New Works Planning and Programming and setting Project Milestones
  • Planning of Site Layout
  • Site Representative of the Employer
  • Coordinate Design Issues with Project Managers
  • Administer Direct Contractors' Contracts
  • Coordinate Site Issues with Direct Contractors
  • Document Control
  • Progress and Quality Monitoring
  • Assessment of Direct Contractors' EOT Claims

planning engineer, (AL Said for Consulting Engineering),egypt, Intake, booster and pipelines of 10th Ramadan water treatment plant,egypt

START Date
END Date

(AL Said for Consulting Engineering),cairo,egypt



Title: Project management engineer (Planner-Time & Cost control): planning and follow up tasks (time schedule, resource definition and allocation, cash flow, follow the progress and readjust according to the actual performance.

MANAGER - PLANNING, LARSEN & TOUBRO LIMITED, TAPOVAN POWER PROJECT

START Date
END Date

PROFESSIONAL STRENGTHS

 

Dynamic and accomplished professional with over 4 years of experience in the construction industry especially Tunnelling (TBM and D&B). My Key strengths are

ð  Project  planning, scheduling & monitoring

ð  Cost Estimation, budget formulations and cost control

ð  Contracts Management (Well versed with FIDIC Guidelines)

MANAGER - PLANNING, LARSEN & TOUBRO LIMITED, TAPOVAN POWER PROJECT

START Date
END Date

PROFESSIONAL STRENGTHS

 

Dynamic and accomplished professional with over 4 years of experience in the construction industry especially Tunnelling (TBM and D&B). My Key strengths are

ð  Project  planning, scheduling & monitoring

ð  Cost Estimation, budget formulations and cost control

ð  Contracts Management (Well versed with FIDIC Guidelines)