Mian Mohammad Aslam

First Name
Mian Mohammad
Last Name
Aslam
Professional Since
Years Experience
0
LinkedIn Profile
https://www.linkedin.com/home?trk=nav_responsive_tab_home

Basically civil engineer graduated in 1986.MBA - Specilazed in Project Management.With More than 28 yesrs of diversified and extensive work experience in construction industry; positioned at mega projects as design and consulting engineer, design manager, planning engineer and to senior planning manager, project manager to project director, QHSE manager to IMS and strategic Planning Manager. Author of "Journey of Excellence - Construction Industry".

Steve Dunbar

First Name
Steve
Last Name
Dunbar
Professional Since
Oldest experience
Years Experience
6

Planning Enginner, progressed to Planning Manager between 1985 and present.

Planning role from project inception and feasiabiliy studies through tender and construction period and then some experiance in post contract works.  I have been involved in both the prepertation of claims and in the preperation of claims.

Project experiance includes: building, civil enginnering and railway works.  Huge range of values from £100k to £250m.

Some experiance with mentoring planning staff.

Started with stencils and a slide rule - and have seen the arrival and de

Site Engineer / Management / Planning, Various, Various

START Date
END Date

My experiance prior to joining Dave Gibson Associates followed a well worn path for Planning Engineeres.

1979 Company Trainee with Wimpey, moving throguh the various disciplines and roles settling into Site Enginering.  I spent many a happy year peg bashing all over the UK until I was moved into Project Management.

I have been employed by a number of companies since in; Building, Civil Engineering and Railway Works.  I have been directly employed by construction firms and by consultants, I have also worked self employed.

Project Controls Manager, Saudi Oger Ltd., King Abdullah Project for the Development of Security Centers – Phase 1 (KAP1)

START Date
END Date

Project: King Abdullah Project for the Development of Security Centers – Phase 1 (305 sites) – KAP1.

Location: Riyadh, Saudi Arabia.

Value: US$ 2 Billion.

Client: Ministry Of Interior (MOI)

Team Composition: 22 (2 Section Planning Managers) + 6 Senior Schedulers + 12 Schedulers + 2 Reporting Engineers).