Civil / Building / E&M

Hari Ganesh

H
Hari Ganesh 👤 Member for 12 years 7 months
First Name
Hari
Last Name
Ganesh
Professional Since
Years Experience
0
Telephone Number
+918220292229
LinkedIn Profile
http://www.linkedin.com/profile/view?id=273301045&trk=nav_responsive_tab_profile
Facebook Profile
https://www.facebook.com/harish.dpi.in
Twitter Profile
https://twitter.com/harish_dpi

 

 

HARIGANESH.S

S/o: M.SELVARAJ,

3/320, A.Reddihalli,

Sogathour (po),

Dharmapuri,  

Tamilnadu, India.  PIN: 636703.

E-mail ID: [email protected]

Emi Itoya

E
Emi Itoya 👤 Member for 12 years 7 months
First Name
Emi
Last Name
Itoya
Professional Since
Oldest experience
Years Experience
0

I am self-motivated with an excellent interpersonal, communication and organization skills. I pay good attention to details. I have a developed ability to work under pressure, rise to the challenges of conflicting workloads and tight deadline in a busy and thriving organization. I am hardworking, enthusiastic, and innovative. I also have the ability to be involved in a multi-disciplinary engineering project that requires the use of engineering knowledge and science. My flexible approach and ability to think laterally make me a formidable team player

Planning Engineer, "Balfour Beatty Infrastructure, Inc", Railway, Highway, Civil and Build Engineering

E
Emi Itoya 👤 Member for 12 years 7 months
START Date
END Date
  • Duties include developing comprehensive project programme (Target Price, Secondary Baselines and Construction programme) for the framework projects (Enhanced Track Replacement, Pit block, Life extension, Tunnel Refurbishment) using P3e, incorporate resource and skills planning to accurately report cost of work done and cost to completion, Cost loading, materials planning, cost estimating, earned value (EVA) forecasting, reporting and identifying critical paths and develop and implement action plans to maximize project quality.

Planning Engineer, Mcnicholas rail, Thameside Fire Protection, Dyer and Butler, Assignments: Crossrail

E
Emi Itoya 👤 Member for 12 years 7 months
START Date
  • Expert use of P6 (Primavera Version 6.2) to develop comprehensive Tender, Baseline and Construction Project plans for Civil, M & E, Signal and Fire Installations Projects within the Network Rail and London Underground Network Systems.

Project Scheduler, James G. Davis Construction Corp, (various projects)

START Date
END Date

Project Scheduler.  Responsible for providing technical support and education to the operations staff in CPM scheduling at the project level. Reviewed schedules with project teams to ensure schedules were being developed properly. Also assisted the Director of Scheduling with developing schedules for presentations and proposals.

Planning Engineer, SINOTEC CO., LTD, Marala Hydro Power Project (8MW), Daralkhwar Hydropower Project (36MW)

N
Naseem Khan 👤 Member for 12 years 7 months
START Date
  • Preparation of  EPC Base line Schedules (Civil, Mechanical and E&I)
  • Monitoring of Projects
  • Preparation of Monthly and Weekly Reports for Clients
  • Preparation of Look ahead Plans
  • Earned Value Management (EVM)  and S-Curve analysis for monthly and weekly meetings
  • Estimation of Resources

Naseem Khan

N
Naseem Khan 👤 Member for 12 years 7 months
First Name
Naseem
Last Name
Khan
Professional Since
Oldest experience
Years Experience
5
Telephone Number
+923335712525
LinkedIn Profile
Facebook Profile
Twitter Profile
  • Preparation of  EPC Base line Schedules (Civil, Mechanical and E&I) using P6 r8.2
  • Assigning resouces in schedule (manhours / equipments / cost)
  • Monitoring of Projects
  • Preparation of Daily, Monthly and Weekly Reports for Clients
  • Preparation of Look ahead Plans Weekly/Biweekly/Monthly
  • Earned Value Management (EVM)  and S-Curve analysis for monthly and weekly mreetings
  • Calculation of Manhour/Manpowers & Equipments
  •  

Planning Engineer, Descon Engineering Limited Pakistan, UCH-II Power Project 400MW

N
Naseem Khan 👤 Member for 12 years 7 months
START Date
END Date
  • Preparation of Integrated Project Schedule as baseline on Primavera (P6).
  • To determine Scope of work, Work Breakdown Structure (WBS), Organization   
  • Breakdown Structure (OBS) and Work procedures/ Methodologies
  • Preparation of Weekly and Monthly Progress report for client.
  • Analysis & Forecasting of reports and Schedule Plans
  • Preparation of Interim Payment Certificates and Costing
  • Preliminary working on sub-contracting and tendering.
  • Preparation of Rate Analysis of Non BOQ’s item.
  • Prepara