Civil / Building / E&M
Architectural Designer / CAD operator, Sidra Company, Pearl Qatar Project,
Designer Draftsmen, Planning, Construction, site supervision,Sketching, 3d Modeling, scale Modeling,
Amr Elbassyouni
- I am working in mega projects for the last nine years, with a budget varies from 250 to 2000 million $, which were include (Two shopping malls, a five stars hotel and ten high rise residential buildings, ended with the current project which is a 7.5 billion S.A.R governmental project in Riyadh-KSA
-I had a Strong back ground in site (8 years starting from site engineer to project manager in contracting company), followed by two years as a tender estimator.
8 years from a site engineer up to project manager + 2 years as a senior cost estimator, Sep. 91 – Oct. 01 Mediterranean Contracting Co, various residential projects
My position
Construction Manager (Apr. 01 – Oct. 01)
Project name
Dar El Abtal for the air forces - Cairo -Egypt
Project Budget
(8,620,762 LE)
Project description
8 years from a site engineer up to project manager + 2 years as a senior cost estimator, Sep. 91 – Oct. 01 Mediterranean Contracting Co, various residential projects
My position
Construction Manager (Apr. 01 – Oct. 01)
Project name
Dar El Abtal for the air forces - Cairo -Egypt
Project Budget
(8,620,762 LE)
Project description
Lesley Ludick
Rinum Kinsok
Planner or Planning Engineer, PREZIA ENGINEERING ILUPEJU, LAGOS, NIGERIA, Construction of ODUA TEL Head Quarters, Ibadan, Nigeria, Construction of GT Bank Anthony Branch, Lagos, Renovation of Abesan Estate (200 Units), Lagos, Nigeria
- Preparation of Baseline Program of Works (PRIMAVERA P 3.1)
- Project Material Procurement & Tracking Schedule for long lead items.
- Project Productivity Tracking /Cash Flow for monitoring.
- Project Resource Histogram for Project Control.
- Look Ahead Program for monitoring the sub-contractors.
- Preparation and issue of all t
Pagination
- Previous page
- Page 678
- Next page