Civil / Building / E&M

PLANNING ENGINEER, AHMED BARAKAH TRADING & CONTRACTING, Construction of 45 VILLA Complex and its Interior work

START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
650
Experience Hours (Forensic Analysis)
500

Ø  Establishing realistic schedules for all projects and ensure implementation of most appropriate and effective progress measurement and reporting systems by the Consultants & Subcontractors to enable effective monitoring of the progress and timely project completions

Ø  Preparation of integrated Baseline from project submittal and follow up on the all phases of project work with the aid of Primavera P6.

Planning Maintenance Engineer, Wealmoor Ltd, WealMoor

START Date
END Date
Experience Hours (Planning & Scheduling)
5000
Experience Hours (Cost Management)
5000
Experience Hours (Forensic Analysis)
5000

u  Involved in construction of  Hayes & Greenford Wealmoor Industrial sites in London

u  Developed cost and resource loaded Project schedule using Primavera P3e and Ms Project

u  Prepared progress reports which included histogram, S-curves and variance analysis.

u  Monitor subcontractor’s performance and quality of work

Planning Maintenance Engineer, Wealmoor Ltd, WealMoor

START Date
END Date
Experience Hours (Planning & Scheduling)
5000
Experience Hours (Cost Management)
5000
Experience Hours (Forensic Analysis)
5000

u  Involved in construction of  Hayes & Greenford Wealmoor Industrial sites in London

u  Developed cost and resource loaded Project schedule using Primavera P3e and Ms Project

u  Prepared progress reports which included histogram, S-curves and variance analysis.

u  Monitor subcontractor’s performance and quality of work

Planning Manager , CH2MHill, Various Design and Build Project like Cross Rail , TCR , Signalling Update

START Date
END Date
Experience Hours (Planning & Scheduling)
9000
Experience Hours (Cost Management)
9000
Experience Hours (Forensic Analysis)
9000

u  Created work breakdown structure  to define the project scope into “manageable” work packages and make sure the entire scope is covered in WBS

u  Produced Project Plan which included Gant Chart, Network Diagram, S-Curves and Resource Histogram using Project Management Information Systems like Primavera , MS Project and Project Commander

u  Performed Earned Value Management analyses to measure project progress against agreed baseline

Planning Manager , CH2MHill, Various Design and Build Project like Cross Rail , TCR , Signalling Update

START Date
END Date
Experience Hours (Planning & Scheduling)
9000
Experience Hours (Cost Management)
9000
Experience Hours (Forensic Analysis)
9000

u  Created work breakdown structure  to define the project scope into “manageable” work packages and make sure the entire scope is covered in WBS

u  Produced Project Plan which included Gant Chart, Network Diagram, S-Curves and Resource Histogram using Project Management Information Systems like Primavera , MS Project and Project Commander

u  Performed Earned Value Management analyses to measure project progress against agreed baseline

Senior Programme and Risk Manager, Mott MacDonald Limited, Various Design and Build Project

START Date
Experience Hours (Planning & Scheduling)
9000
Experience Hours (Cost Management)
9000
Experience Hours (Forensic Analysis)
9000

I am experienced project planning and controls professional with extensive skills using Primavera P3, P5 and P6 in the  Power distribution ,Oil & gas ,Rail  and Highway engineering sector .I can comfortable working as part of an integrated team or completely independently. I have extensive professional record of developing and maintaining realistic schedules for projects of all types. I have skills in identifying potential problems and providing innovative and effective solutions on projects of all sizes.

Abdul Qadeer

First Name
Abdul
Last Name
Qadeer
Professional Since
Years Experience
0
Telephone Number
00923017038824

 

§  Over all working based onPrimavera(P3 & P6).

§  Preparation of Level – 3 & 4 Plan  in  Primavera (P3 & P6)

§  Planning and Scheduling of Mechanical / Civil Project.

§  Preparation of daily and weekly schedule based on 4 week and 3 month look ahead Plans

Hesham Arafa

First Name
Hesham
Last Name
Arafa
Professional Since
Oldest experience
Years Experience
8

MS Project / P6  / Tilos

Reporting Systems

Site Civil engineer, Hassan Allam Co – Contractors, Tersana Sporting club football stadium first class spectator’s tribune.

START Date
END Date
Experience Hours (Planning & Scheduling)
8000
Experience Hours (Cost Management)
8000
Experience Hours (Forensic Analysis)
4000

Hassan Allam Co – Contractors

Egypt

 Site Civil Engineer Project Control  

 

Projects:

  • Tersana Sporting club football stadium first class spectator’s tribune.