Civil / Building / E&M
Philip Jernigan
Pre-construction Planner / scheduler for EllisDon.
Richard Welsh
Planning Engineer, CODE CONTRACTING, Buildings and Water
As Planning Engineer I was Responsible for all the Planning and Cost Control aspects of the Projects assigned. I was reporting to the Contracts Manager. Main responsibilities covered under the role were preparation of cost and resource loaded master schedule, monitoring of actual work against approved schedule and issuing early warnings to relevant department on any deviation, preparation of earned values and comparison with the actual cost to measure the profitability of projects, Preparation of S-curves, monthly reports and preparation of EOT claims.
Sunil Babu
ravishankar patil
A. PROJECT PLANNING & CONTROL
1. Prepare and Update Master Schedules/Programme in Oracle Primavera 6 - consisting of Engineering, Procurement and Construction.
2. Closely Monitoring project progress on Primavera – 6 for L2 & L3 EPC Schedules.
3. Prepare Deliverable schedules & Tendency Analysis
Maintenance Engineer, Afnan Water Factory, Maintenance Process Implementation, LOTO, PTW, Toolbox, Preventive Maintenance
Mechanical Engineer/Planner -AFNAN WATER FACTORY
Hanaia Road, Alkharj City, KSA (Dec. 16,2011 – Sept. 15, 2012
Pagination
- Previous page
- Page 562
- Next page