Civil / Building / E&M
Duc Nguyen Hoai
christl goksel
AutoCad Operator, ANEL Group, New Doha International Airport
Preparation, Coordination of Design Drawings submitted for approval of Consultant for Construction
Stewart Whittaker
Currently in conrol of small construction arm of a 3 company business, we cover reactive and planned maintenance, small works and insdustrial alterations to recycling plant.
Peter Judge
Project Co-ordinator - Construction
Planning Phase
Design Phase
Budget Phase
Safety
Constuction Phase
Close Out
Shree Abdullah
I am a professional civil engineer, capable of implementing my acquired knowledge in the field. I have expertise in the field of construction management, quantity and cost estimation, towns planing alongwith site supervision. I am confident not only for my techinical skills but also for personal skills. I am capable to lead, but at the same time ready to follow.
Planning and Documentation Engineer, Nazir Contracting Private Limited, Development of Greater Iqbal Park
Planning
- Planning and implementing project on Primavera P6
- Monitor and control of the project using Primavera P6
Document Controller
- Submission and recieving of requests for approval for IPCs
- Site observation with the site inspector.
- Creating measurment sheets
- Editing BOQs
Site Supervisor
- Execution of work on site according to the drawings and sepecifications
- Submitting progress reports.
Jude Lamadrid
Wide experience on project implementation under various phases such as Feasibility Studies, FEED, Design, Detailed Engineering, EPCM (Engineering, Procurement, Construction Supervision and Project management), EPC / LSTK (Lump Sum Turnkey) and Project Management Consultancy (PMC) role/phases of projects in the varied fields.
Planning Manager, Astad Project Management, Building and infrastructure, Mixed Used Facilities
Provides professional Planning and Project Controls services to Company, Client, Project Team and Line Management from project initiation to project handover for allocated projects in line with company policy, relevant procedures and quality plan.
Pagination
- Previous page
- Page 508
- Next page