Civil / Building / E&M
Regional Planner, Interserve Construction Limited, (various projects)
Regional Planner, a resource to do monthly site checks and also tender planning when required
4D Planner, Mohammed Abdulmuhsin Al Kharafi & Sons (MAK) Kuait, (c) construction of road
i am working in contracting company
my job is prepare a work plan from skratch and create afull work schedule with cost loading and get consultant approval for the schedule and updating and control the work progress monthly wise and report to project manager
Tim Adeleye
Tim is a self-motivated and result oriented Planning Professional with over 10 years of Project Operations experience entailing Project Control Management, Civil Design, Contract Management(E.g NEC suite), Project Planning and Scheduling and Cost Control at organization and site level. Tim has experience spanning several industries such as Building and Construction, Heavy Civils,Oil and Gas and Rail.
PLANNING ENGINEER, EKL engineering kinetics limited, Power Plant Project
· Preparation & Tracking of the project master schedule & detailed schedule of Civil, Mechanical & Electrical work up to level-4 and summary level curves and Man power histogram using Primavera P-6.
· Identification, monitoring & streamlining of critical paths running through the Project master Schedule and individual contracts.
Project Engineer, Pan Engineering, Industrial Building Construction
Projects Site Engineer, Scheduler
M+W Group, Singapore.
From- Nov’ 2005
To- April 2007
· Supported and promoted the Health and Safety Program to meet the organizations objectives
James Brown
Site engineer, Baulderstone, Harden Network
i was the site engineer for the HNA porject where my responsibilites include the following
Mike Morrice
Name
Dr Michael Morrice
Address
31 East Murrayfield ,Bannockburn .FK7 8HS
Planning/Scheduling Engineer, PEG South East Asia Inc., CEMEX Project, HOLCIM Projects, LaFarge Projects
· Project life cycle management.
· Project planning, scheduling and monitoring involved in Cement plant modification, upgrades and shutdown works.
· Review of ITB documents and project details.
· Detailed project review for preparation of proposal schedules.
Pagination
- Previous page
- Page 391
- Next page