Planning & Coordination Engineer, AAA Partnership Pvt. Ltd., Various Tower & Fit Out Projects

START Date
END Date

Ocean Mall & TowerFloor Area 41800 sqm comprising 5 Basements and 27 floors cost USD 81million

Center Point TowerFloor area 32500 sqm comprising ground plus 27 floors cost USD 28million

IGI Financial Services    and Proctor & Gamble PakistanOffice fit-out projects

Faysal HouseCommercial building comprising 2 Basements and 9 floors cost USD 8.5million

Planning Engineer, Leighton Contracting Qatar, Al Shaqab Equestrian Centre

START Date
END Date

Equestrian facility comprising race course, hospital, riding school, staff accommodations, etc. spreading over 1.5 sqkm with the project cost USD 450million. Leighton was the main contractor for the Design & Build contract. Key responsibilities on the project are below

Project Engineer, Bovis Lend Lease (Australia), Various fit out projects (mostly bank branches)

START Date
END Date

Working as a project engineer/project manager I delivered number of fit-out projects for various branches of ANZ Bank and Commonwealth Bank CBA in South Australia and modification works for Telstra exchanges. Cost of these projects varied from AUD 50,000 to AUD 1.5million. All projects were carried out under Project & Construction Management contract. Key responsibilities on the projects are below.

Regional Planner / Scheduler, Bovis Lend Lease (Australia), National Broadband Network (NBN FTTN)

START Date
END Date

The project was part of a nationally rolled out program to install fibre optic cables for high speed internet across Australia. Lend Lease was awarded design & construction contract in South Australia and Western Australia, cost AUD 800million. It was a Design & Build contract. Key responsibilities on the project are below.

Senior Planner, John Holland Group, Perth Children's Hospital

START Date
END Date

State of the art hospital in Perth for children, 298 bed capacity and comprising 5 to 8 floors of three building blocks with overall floor area of 120,000 sqm, cost AUD 1.2 billion. John Holland was the Managing Contractor for the Design & Build contract. Key responsibilities on the project are below.

antonios adel

First Name
antonios
Last Name
adel
Professional Since
Oldest experience
Years Experience
2
Telephone Number
01283587837
LinkedIn Profile
https://www.linkedin.com/in/antonios-adel-45a172aa/

planning and scheduling engineer with experience at primavera p6 proffisional.