Site Civil engineer, Bombela Civil Joint Venture, Gautrain Rapid Rail Link
BOMBELA CIVIL JOINT VENTURE: GAUTRAIN PROJECT Viaduct 14 and 15.1: Site Engineer (September 2006 to August 2008)
Site Administration
- Managed and updated Safety inspection procedure’s records
- Controlled Site Documents (submissions of letters to utility authorities, minutes, filing, issuing drawings),
- Managed records of utility progress and issued purchasing orders for site materials
Safety & quality control
Area Project Manager, Focus Project Management/Loliwerail Solutions, Sectional Handover Phase 1 and 2 for refurbishment - Transnet Freight and Rail
FOCUS PROJECT MANAGEMENT- Project Manager (February 2014 to March 2015)
Site Project Planner, BASIL READ, De-hoop dam
BASIL READ - Site Project Planner (October 2012 – January 2014)
Assistant Project Manager / Project Planner, Townshed van der Walt and Partners, Process engineering
TWP – TOWNSHEND VAN DER WALT AND PARTNERS: Site Project Planner (June 2011 to October 2012)
- Researched and compiled data from engineering disciplines for schedule
- Reviewed and monitored sub-contractors and supplier schedules
- Prepared and Monitored Project scheduling for Process engineering
- Developed and generated execution schedules according to project master schedule
- Reviewed and diagnosed scheduling process
- Assisted and mentored Planner by introducing them to planning principles and process
Mudasar Shaik
Primavera P6
MIcrosoft Office
Planning Engineer, Fujita Corporation, Qatar Rail, Metro Project
- Monitoring and updating the weekly progress report with S-curves, manpower and equipment utilization report.
- Maintained the database for the daily progress in Microsoft Access, and produced the manpower histograms, and compared it against the budgeted manpower
Douglas Robertson
mohsin iqbal
ANALYST / PLANNING ENGINEER, Shell bird Group, Palm Deira Island Pumping station infrastructure works
Monitored man hour booking, manpower, material, equipment status on a regular and ongoing basis for the project and highlight any discrepancies to the Project Manager/ Management.• Assisted in the development of manpower requirements for specific work disciplines and assist in resource levelling analysis to perform quantity and manpower resource loading for assigned schedules.• Determined critical path activities for work areas and / or work disciplines and monitor schedule deviations and proposes corrective action/work around solutions.• Identified and re