Sr. Planning Engineer, Saudi Oger Ltd., Pension Fund Office Building (Dabbab Towers) Riyadh K.S.A $ 150 Millions
Planning Monitoring Controlling & TIA (Time Impact Analysis)
PLANNING ENGINEER, ETA M&E,Bangalore, Wipro Ltd
- ProjectExecution Planning Level 3 & Level 4, Material, Procurement & Shop Drawing Production Planning
- Creating Baseline Contract Programme
- Critical path method (CPM) analysis, variance analyses, floats analysis and schedule trending.
- Project Updating, Scheduling, and Leveling
- Managing Baselines.
- Proactive influence to Project Management with regard to general Policies, Plans and Strategies in order to optimize Project execution
- Preparing Organization Charts & Labor Histograms
- Customizing Reports MIS &am
Project Management Consultant, Retired, All
Certified Project Management Professional , PMP
Lecturer of PMP in Order of Syrian Engineers
Prabhu Ramachandran
R.PRABHU
Engineer (Planning & Designs), WAPCOS, Infrastructure, Hydro-Power & Water Resources
- SALMA DAM PROJECT (14 x 3 = 42 MW),AFGHANISTAN
- LOHARINAG-PALA H.E. PROJECT (4 x 150 = 600 MW), INDIA
- LATA-TAPOVAN H.E. PROJECT (3 x 36 = 108 MW), INDIA
- TAPOVAN-VISHNUGAD H.E.
Rajath Sriranga Raj
· Planning, Scheduling & Monitoring of the Project Activities
· Monitoring/Tracking of projects using project tools on a continuous basis by updating the Baseline Program, generating Planned V/s Actual Histograms for resources, Checking Critical path and floats in activities etc.
· Project Cash Flow and Budget Preparation
Sr.Planning Engineer, Delta Emirates Contracting Co.LLC, Red Residence ,Kensington Royal Tower ,Berlin City Center ,Exchange Tower
Currently handling Different Projects of Delta Emirates Mainly
1) 2B+G+22 & 2B+G+18 in Dubai Sport city –Client: - M/S Middle East Development - Project CostAED277million
Running Project
2) 3B+14+R at Al Barsha Dubai –Client –Dubai Islamic Bank Project cost AED 147 million
Project at Finishing Stage - Working on Claims/EOT
3) 4B+G+M+28 -Berlin City Center in Mizin -Dubai
Working on Master programme /Baseline