Planner Junior, EPCO building, Heating for building
Progress monitoring ,schedule updates and figures reporting belong P3 software
progress analysis
Progress monitoring ,schedule updates and figures reporting belong P3 software
progress analysis
Project Planner / Assistant Project Manager
1 Coleman Street, Structural concrete to office development on Coleman Street by Moorgate Station, London
Client: Stanhope and Bovis Lend Lease
The scheme includes major ground works, substructure concrete, and steel frame superstructure with in-situ concrete slabs.
2004 – 2005 Assistant Pr
I was working as part of the construction site team in M25 Holmesdale Project, Enfield. The project is to refurbish tunnel structure on M25 junction 25, Holmesdale Tunnel. The scheme includes ground works, piling, demolition, construction of reinforced concrete walls and deck, and mechanical and electrical installation.
I am working to assist the company’s Pre-Construction Team on preparation of pre-contract planning by establishing the tender programme, logistic plan, resources plan, prelims, tender stage method statement, traffic management plan, and health and safety plan. I also am working with the company’s Operational Construction Team to assist in establishing and monitoring the construction programme, target construction programme, and short term programme.
The oil refinery built by VEGYÉPSZER as a subcontractor to TCO/CHEVRON, time-sheet based Train-5 project in Tengiz/Kazakhstan employing around 400 people; my duties included administering the project control of the economic management and supervising the timekeepers’ work, checking the time-sheet reports; planning and scheduling by P3; total control from the recording process to summarising the workhours for issuing monthly invoices
I was involved in a project of Tengizchevroil as a Planner/Scheduler (Chevron Corporation), namely the Crude Export Project; I worked together with the planning team of TCO as the leader of Contractor’s planning team; I coordinated scheduling of the civil, electrical and piping works; all schedules had to be made in P3 format; my part time duty was also to manage contract issues and develop and monitor the project controls; I also had knowledge of US construction industry techniques
1. 2010 to present; Agip KCO – Dietsmann SpA: Lagoon Mechanical Evaporator System civil, mechanical and electrical works
I was actively contributed to the elaboration of tender quotation from the project starting and developed the WBS of schedule, the project controlling and reporting system based on S-Curve analysis by earned value, collecting and checking data on site for the continuous progress analysis and for maintaining the project schedule
Develop, monitor, track, analyze, forecast, and report on multiple project budgets, commitments, expenditures, project progress, productivity, manpower, work plans schedules, and subcontracts.
- Develop construction baseline and required resources for relevant parts of the project estimates to be implemented as a base line reference for subsequent project monitoring and controlling.
- Develop procurement baseline identifying the products to be procured, the timeframe and method of